Similar Projects
Driveway Improvements at The Waste Water Treatment Plant and Paving Public Utilities Work Yard
Results
Less than $198,450 est. value
Statesboro, GA 30458

Brooklet Elementary Parking Improvements
Results
Arcola, GA 30415

Airport Fuel Tanker Driveway Construction and Parking Lot Resurfacing
Results
Less than $60,028 est. value
Statesboro, GA 30458

Herty Drive/Edgewood Drive Sidewalk Improvements
Results
Less than $153,644 est. value
Statesboro, GA 30458

West Jones Sidewalk Improvements
Results
Statesboro, GA 30458

West Jones Street Sidewalk Improvements
Results
Less than $134,670 est. value
Statesboro, GA

East Main Street (S.R. 24) and Packinghouse Road Sidewalk Installation Project
Results
Less than $477,927 est. value
Statesboro, GA 30459

Akins Boulevard Extension And Intersection
Results
Statesboro, GA 30458

Edgewood Park Pedestrian Bridge
Results
Less than $62,500 est. value
Statesboro, GA 30458

Statesboro Police Department Parking Lot
Results
$92,868 est. value
Statesboro, GA 30458

Police Department Parking Lot Extension FY 2021
Post-Bid
Statesboro, GA 30458

South Campus Connector Road
Infrastructure
Results
Statesboro, GA 30460

FedEx
Infrastructure
Post-Bid
Statesboro, GA 30458

Water and Sewer Improvements
Infrastructure
Post-Bid
Statesboro, GA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 08/11/2021 08:26 AM
Project Title

Blue Mile Utility and Streetscape Phase 1

Physical Address View project details and contacts
City, State (County) Statesboro, GA   (Bulloch County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,956,569
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes utility, and streetscape upgrades along South Main Street / U.S. 301 from the Fair Road intersection, south to the Tillman Road intersection; and utility upgrades and roadway improvements along Kennedy Street from South Main Street /U.S. 301 intersection, east to the Tillman Road intersection. Utility upgrades will include the replacement/installation of approximately 2,833-lf of storm sewer, 2,500-lf of water main, 827-lf of sewer main, and 2,650-lf of natural gas main. Electrical and communication utility upgrades will be provided by each utility owner. Streetscape and roadway improvements will consist of roadway milling and resurfacing, new curb & gutter, standard tapered driveways, sidewalks, stamped concrete crosswalks, two bus stops with shelters, landscaping, and ornamental signage.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents