Similar Projects
Rolling Hills New Building Facilities
New Construction
Conception
$42,000,000 est. value
Byesville, OH

Potential New School Buildings & Renovations
New Construction, Renovation
Conception
Liberty Township, OH

6-8 Middle School
New Construction - 205,000 SF
Design
$98,000,000 est. value
Milford, OH 45150

School Facilities Projects Phase 2
New Construction - 400,000 SF
Design
Less than $250,000,000 est. value
Gahanna, OH

PrimaryOne Health School Based Health Clinic Project at the Columbus North International & Columbus Global Academy HS
New Construction, Infrastructure
Bidding
$745,000 CJ est. value
Columbus, OH 43215

RFQ - School Site Redevelopment
New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Middletown, OH 45044

Construction Manager at Risk Service
Post-Bid
Less than $58,442,751 est. value
Fairborn, OH

Phase 2 of Its Master Facilities Project
Renovation
Post-Bid
Gahanna, OH

Vinyl Siding/Porch Railing Replacement Project
Results
$351,000 est. value
The Plains, OH 45701

Hamilton County East Garage Stair Repairs Project
Results
Less than $235,300 est. value
Cincinnati, OH 45202

PK-12 School
New Construction, Demolition
Construction
Springfield, OH 45503

Warrensville Heights Segment 2F
Construction
Less than $38,259,699 est. value
Warrensville Heights, OH 44128

Saint John School Expansion
Renovation, Addition
Pending Verification
Ashtabula, OH 44004

2022 Bond - Columbus City Schools
Renovation
Conception
$680,000,000 est. value
Columbus, OH

New PreK-12 Facility
New Construction
Design
Columbiana, OH

Last Updated 08/02/2022 08:36 AM
Project Title

Curtain Wall Improvements - Shawnee Middle and High School

Physical Address View project details and contacts
City, State (County) Springfield, OH 45506   (Clark County)
Category(s) Education, Single Trades
Sub-Category(s) Finishes/Exterior, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $365,570 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 1, 2022, no bids received. There is a plan for rebid but not until the end of fall. BP#1 - Curtain Wall Improvements - Said work consisting of: Demolition of existing curtain wall system and replacement with new curtain wall for Shawnee Middle and High School. Work includes all work necessary for selective demolition of existing curtain wall system and installation of new curtain wall, aluminum entrance, louvers and finish work as indicated in the Contract Documents. Project Location: 1675 E. Possum Road, Springfield, OH 45502 Questions Deadline : by 9AM Monday June 6th, 2022 Project Schedule: 1. Anticipated issuance of Notice to Proceed: June 17, 2022 2. Site available to contractors: June 20, 2022 3. Substantial Completion date: August 26, 2022 4. Project Completion date: September 26, 2022 $365,570.00 base bid

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Mirrors, Vents.
Division 09 - Finishes, Maintenance of Finishes, Maintenance of Wall Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents