Similar Projects
Air Source Heat Pumps to be Installed at the Windsor Town Hall to Provide Heating and Cooling
Alteration
Bidding
$50,000 est. value
Windsor, MA

HVAC Upgrades, Paterson Field House - General Bids
Alteration
Bidding
$850,000 est. value
Pittsfield, MA 01201

Heating System Maintenance, Repairs, And Replacements, Chimney Repairs And Liner Installations
Post-Bid
Pittsfield, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

HVAC Maintenance for Various Schools
Results
$278,142 est. value
North Adams, MA

Re-Tubing #2 Boiler at Pittsfield High School
Results
$67,450 est. value
Pittsfield, MA 01201

HVAC and Mechanical Products
Term Contract
Post-Bid

Kittredge Elementary School HVAC Controls Retrofit
Results
$45,000 est. value
Hinsdale, MA 01235

Automatic temperature control/ventilation control system - McCann Technical School
Post-Bid
North Adams, MA 01247

Replace Existing Boiler Venting System
Results
Less than $17,000 est. value
North Adams, MA

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Systems Upgrade, Gabriel Abbott Memorial School
Results
Less than $114,000 est. value
Florida, MA 01247

HVAC Replacement at Water Department
Alteration
Post-Bid
$21,000 est. value
Pittsfield, MA

Sludge Spiral Heat Exchanger
Alteration
Results
$45,000 est. value
Pittsfield, MA

Purchase and Installation of One Heating Pump
Alteration
Post-Bid
Mill River, MA

Last Updated 01/05/2022 10:33 AM
Project Title

HVAC System Replacement - General Bids

Physical Address View project details and contacts
City, State (County) Sheffield, MA 01257   (Berkshire County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. This project includes the replacement of all the perimeter and ceiling mounted unit ventilators, rooftop air handlers and associated roof top exhaust fans in-kind. Both the new unit ventilators and the exhaust fans shall be monitored and controlled by the existing BMS.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents