Similar Projects
2022 ADA Ramp Project
Infrastructure
Bidding
$100,000 to $120,000 est. value
West Jordan, UT

Redwood Health Center Parking Lot Maintenance
Infrastructure
Bidding
Salt Lake City, UT 84119

650 S Construction Trax Platform
Post-Bid
$1,750,000 to $2,000,000 est. value
Salt Lake City, UT

300 East - 3900 South to 3970 South
Post-Bid
Millcreek, UT

2020 Sidewalk Repair Project
Results
$55,500 est. value
West Jordan, UT

Northwest Avenue Sidewalk,5415 So to 5570 So Pedestrian/Bike Facility
Results
Less than $500,000 est. value
UT

Millcreek 3900 S Trail Improvements
Infrastructure
Bidding
Millcreek, UT

Replacement Of Damaged Concrete Drive At The Crossroads Of Taylorsville
Alteration
Post-Bid
Taylorsville, UT 84123

1690 West and Loumis Parkway Improvements
Results
Less than $800,000 est. value
Bluffdale, UT

Tax Commission Building Concrete/Irrigation Repairs
Infrastructure
Post-Bid
$195,000 est. value
Salt Lake City, UT 84103

Remove and Replace Parking Lot and Sidewalks
Results
$300,000 to $350,000 est. value
Salt Lake City, UT 84105

Construction of the Wide Hollow Trailhead
Infrastructure
Post-Bid
Herriman, UT

Maybe Lane Improvements
Results
South Jordan, UT

Palmer Court Parking Lot and Security Doors
Infrastructure, Alteration
Post-Bid
Salt Lake City, UT 84111

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Last Updated 02/28/2022 10:33 AM
Project Title

FY 21-22 CDBG Pedestrian Ramp Project

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84128   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $212,950
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of Pedestrian Ramps at various locations within West Valley City. Contractor will be responsible for all labor, materials, equipment, coordination and incidentals necessary to complete work as described in the Contract Documents. The work to be performed generally includes, but is not limited to the following: 1. Reconstruct pedestrian ramps. 2. Other work normally encountered during construction on improved and unimproved properties.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents