Similar Projects
Minor Professional HVAC Repairs
Term Contract
Bidding
Santa Rosa, CA

HVAC Replacement
Alteration
Bidding
Modesto, CA 95358

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

City Hall Building HVAC Upgrades
Results
Less than $125,000 est. value
Santa Clarita, CA 91355

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

Phase II District-Wide Building Automation HVAC Systems and Lighting
Alteration
Bidding
Concord, CA

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replacement of Jail Rooftop HVAC 1-6
Alteration
Results
$810,000 est. value
San Rafael, CA 94903

Peter Johansen High School HVAC Replacement and Eleven (11) Sites HVAC Controls Upgrade Project
Alteration
Bidding
Modesto, CA 95351

HVAC Replacement
Term Contract
Post-Bid
$24,000 to $29,000 est. value
Alameda, CA

EDD Modesto HVAC Replacement
Alteration
Results
$1,839,300 est. value
Modesto, CA 95354

Transit Maintenance Facility HVAC Equipment Replacement - Phase III Rebid
Alteration
Bidding
CA

J041--VA Palo Alto Health Care System Chiller and Cooling Tower Maintenance Services
Term Contract
Post-Bid
Livermore, CA 94550

HVAC Upgrade at the District Operations Center
Alteration
Results
Santa Ana, CA 92799

Reported 09/22/2021 12:00 AM
Project Title

OR Suite HVAC Replace in Building I

Physical Address View project details and contacts
City, State (County) San Diego, CA 92161   (San Diego County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

STATEMENT OF BID ITEM(S) A. ITEM I, GENERAL CONSTRUCTION: OR SUITE HVAC REPLACEMENT - AC 26 REPLACEMENT PROJECT WITH 100% OUTSIDE AIR UNITS AC-74A, AC -74B, CHILLED WATER COOLING, PRE-HEAT COILS, PRE AND FINAL FILTERS, NEW EXHAUST SYSTEMS DEDICATED TO SERVE THE SEVEN OPERATING ROOMS AT THE ROOF, OPERATING ROOM 7 AND HOLDING ROOM ARE ISOLATION ROOMS WITH DEDICATED EXHUAST SYSTEMS, REPLACE ALL VENTURI VALVES FOR SEVEN OPERATING ROOMS AND INCLUDING OTHER NEW WORK AS SHOWN ON DRAWINGS AND SPECIFICATIONS: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment, Packaged Outdoor HVAC Equipment, Dedicated Outdoor-Air Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents