Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Bidding
$10,000,000 to $25,000,000 est. value

1413 West 13th St Rehab Project
Infrastructure
Bidding
$250,000 est. value
Davenport, IA 52804

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

PCC Patching
Infrastructure
Post-Bid
IA

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

Sewer Lateral Program FY23
Infrastructure
Bidding
$50,000 to $600,000 est. value
Davenport, IA

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

PCC Pavement - Replace
Infrastructure
Bidding
$3,000,000 to $3,500,000 est. value
Davenport, IA

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

West 69th Street and Jebens Avenue Road Projects
Infrastructure
Bidding
$200,000 est. value
Davenport, IA 52806

Emerald Drive Reconstruction
Infrastructure
Results
Davenport, IA 52804

2021 Alley Resurfacing Program
Infrastructure
Results
Davenport, IA

Hickory Grove Road Resurfacing, North Pine Street North to end of HMA overlay
Infrastructure
Results
Davenport, IA 52805

Last Updated 05/30/2022 10:42 PM
Project Title

2022 Alley Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Bettendorf, IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements consist of rehabilitating six (6) alleys with an approximate length of 436 feet, 491 feet, 400 feet, 283 feet, 320 feet, and 150 feet respectively. The alley locations are: Crestline Court from Crestline Drive extending south 436 feet to the end, alley from 18th Street to 19th Street between Central Avenue and Bellevue Avenue, alley from 29th Street to 30th Street between Central Avenue and Bellevue Avenue, alley from 12th Street to 13th Street between Mississippi Boulevard and Brown Street, alley from 25th St. extending east 320 feet to the alley between Glenn Street and Cody Street, and the alley on Kohles Court from Grant Street extending south 150 feet and ending at the new pavement section completed last year. The proposed improvements consist of milling the existing surface and subbase placement of granular subbase and resurfacing with Hot Mix Asphalt (HMA). The program also includes partial construction of driveways, sodding, and other work related to reconstruct the alley

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents