Similar Projects
4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Conception
Oakdale, MN

Target
Renovation
Design
Saint Louis Park, MN 55426

Culvert Replacement with Culvert, Approach Grading and Aggregate Surfacing
Infrastructure
Bidding
Wykoff, MN

Wabasha CSAH 81 from MN 60 to US Highway 61
Infrastructure
Bidding
Wabasha, MN

Plymouth Avenue North Reconstruction
Post-Bid
Minneapolis, MN 55400

Bituminous Paving of Vails Lake Road
Post-Bid
Paynesville, MN

In Chisago County on Th 8 A Deer Garden Lane Grading, Bituminous Mill and Overlay, Bituminous Paving and Lighting
Results
MN

2021 Jo Nunn Park Trail
Results
Champlin, MN 55316

Springview Meadow Residential Development
New Construction, Infrastructure
Construction
Prior Lake, MN

Bituminous Paving of 213th Avenue
Infrastructure
Bidding
Payne, MN

Glenwood Grade Separation
Renovation
Post-Bid
Minneapolis, MN

Fish Point Road (CSAH 44 to TH 13) Reconstruction Project Phase 1
Results
Prior Lake, MN 55372

2022 Foley Road, Isle Drive and Forthun Road Improvements
Infrastructure
Bidding
Baxter, MN 56425

Milling, Stabilized Full Depth Reclamation, Full Depth Reclamation, Bituminous Surfacing, Aggregate Shoulders (Modified), Bituminous Seal Coat
Post-Bid
Wheaton, MN

Glen Road, Manitou Lane and Amlee Road Street Improvements
Results
$2,500,000 est. value
Shorewood, MN 55331

Last Updated 01/17/2022 03:58 PM
Project Title

Sauk Rapids-Rise High School 2022 Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Sauk Rapids, MN 56379   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

C. Northwest Parking Lot: 1. Install erosion control devices prior to the start of excavation. 2. Remove and dispose of existing concrete filled steel bollards and parking signs as shown on the Drawings. 3. Repair two catch basins and install finger drains in locations shown. 4. Reconstruct a portion of the concrete island and adjacent concrete curbing located along the west edge of the northwest parking lot. 5. Sawcut and remove existing bituminous pavement and concrete islands as shown on the Drawings. Concrete islands at the north edge of the northwest parking lot shall be reconstructed with new aggregate base and bituminous pavement. 6. Grade and compact existing aggregate base material as required to maintain positive surface drainage, maximize reuse of existing aggregate base, and accommodate new bituminous pavement section. 7. Schedule and perform proof-roll of prepared base in the presence of the Engineer. Where required by the Engineer, perform subgrade corrections by excavating and disposing of existing soils off-site and replacing with new imported aggregate base. 8. Place new bituminous pavement over prepared base, in two lifts. 9. Install new concrete filled steel bollards and parking signs. 10. Stripe parking lot and remove erosion control devices following final site stabilization.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents