Similar Projects
I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Bidding
$30,000,000 est. value
OR

I-84: Multnomah Falls - Toothrock Tunnel - Cascade Locks
Infrastructure
Bidding
$10,000,000 to $20,000,000 est. value
OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

Pruner Road Intersection Improvements
Infrastructure
Bidding
$2,000,000 est. value
Roseburg, OR

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

US 20 - Safety Upgrades (Albany to Corvallis) Albany - Corvallis Highway
Infrastructure
Results
Corvallis, OR 97333

OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Post-Bid
$20,000,000 est. value
Klamath Falls, OR 97601

US20 - Warm Springs Road - Harer Junction Section Central Oregon Highway
Infrastructure
Results
$10,000,000 to $20,000,000 est. value

Last Updated 01/07/2022 02:57 AM
Project Title

US20: 53Road Avenue - East of 60th Avenue (Sweet Home) Section of the Santiam Highway

Physical Address View project details and contacts
City, State (County) OR   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US20: 53rd Ave – East of 60th Ave (Sweet Home) Section of the Santiam Highway (Rt. No. US20) in Sweet Home. FAP No. 7195(002). Req. approx. 915 ft2 temp. signs; 3 ea seq. arr. signs; 2 ea PCMS; 800 hrs flag.; 3 ea flag. sta. light.; 528 ft PCD; 2 ea temp. curb ramp; 656 ft2 temp. walks; 1,393 yd2 comp. eros. blnkt.; 37 ea ck. dam; 577 ft sed. barr.; 96 ton contam. soil disp.; cons. surv. wrk.; 2,892 ft asph. saw cut.; 2,729 yd3 exc.; 2,807 yd2 geot.; 1,907 ft pipe; 2 ea conc. M.H.; 9 ea conc. inlet; 96 ft drain. curb; 3 ea adj. inlet; 3 ea adj. M.H.; 227 yd2 trnch. resurf.; 119 yd3 gran. wall bckfl.; 515 yd2 CPPR; 2,427 ton aggr. base; 769 ton ACP; 585 ft2 asph. slope pav.; 2,578 ft conc. curbs; 700 ft2 conc. islnd.; 220 ft2 conc. drvwy.; 23,532 ft2 conc. walks; 18 ea curb ramps; 312 ft2 trnc. domes; 25 ft gd. rl.; 318 ft conc. barr.; 9,274 ft paint striping; 2.34 yd3 conc. in sign sup.; 1501 lb stl. in sign sup.; 335 ft2 signs; pole found.; lumin., lamps, & ball.; switch., cond., & wire; light. poles & arms; 3 ea flash. beac. install.; wtr. qual. swale; 0.5 acre seeding; 114 yd3 topsoil; 18 yd3 brk. mulch; 247 ft mtl. hdrl.; 1 ea mlbx. sup. Completion Time: October 15, 2022. Classes of Work: Either A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents