Similar Projects
Remove and Replace Roof, Building 21 - HVAC
Alteration
Bidding
$100,000 to $250,000 est. value
Albany, NY 12226

J041--528A8-19-807 Replace Cooling Towers 1 & 2
Post-Bid
$1,000,000 to $5,000,000 est. value
Albany, NY

Albany Community Partnership Heating Systems
Post-Bid
Albany, NY 12206

Campus Center AC-2 Upgrade
Results
Albany, NY

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

HVAC Preventative Maintenance and Emergency Service
Term Contract
Post-Bid
Albany, NY 12207

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Residential Heating System Replacement
Post-Bid
Albany, NY 12206

Re-Pipe Condensate Line at B-35
Results
$25,000 to $100,000 est. value
Watervliet, NY 12189

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

Repair Make-Up Air Units, Bldg 115
Results
$25,000 to $100,000 est. value
Watervliet, NY

Residential Heating System Replacement
Post-Bid
Albany, NY

Preventive Maintenance Service for Refrigeration Systems
Term Contract
Results
Albany, NY 12208

Z1DA--Copy of Albany Chiller Plants Operation, Maintenance & Repair
Post-Bid
Albany, NY

Replace HVAC System - Building 1, Capital District Psychiatric Center
Results
$4,250,000 to $5,500,000 est. value
Albany, NY 12208

Reported 12/29/2021 12:00 AM
Project Title

Heating Unit Replacement

Physical Address View project details and contacts
City, State (County) Cohoes, NY 12047   (Albany County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected January 2022, Construction Completion Expected January 2022
Bids Due View project details and contacts
Estimated Value $15,000 to $20,000
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

This is a 4 unit apartment house in Cohoes. Work needs to be done in 3 of the 4 apartments. Apartments 1 and 2 will need the gas floor furnace made completely in operatable and the gas line disconnected. Then in the 2 first floor apartments a High efficiency gas wall mounted heater will need to be installed in each apartment. Total sq ft for project not available at this time.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents