Similar Projects
Api 653 Tank Inspection - Shaw Afb
Bidding
Shaw Air Force Base, SC

Fuel Tank and Pump Removal and Installation Project
Post-Bid
Jackson, SC 29831

Fuel Tank and Pump Removal and Installation Project
Post-Bid
Jackson, SC 29831

J--Fuel Tank Tightness Testing
Results
Charleston, SC 29401

5500 Gal. Captor Containment Systems
Results

Provide and Install Two New Fiberglass Sewer Tanks and Grinding Pumps at Charleston County K-9 Facility
Post-Bid
North Charleston, SC 29405

MYR General Aviation (GA) Fuel Farm Improvements (Construction)
Results
Myrtle Beach, SC 29577

Thurmond Gazes Research Building Deaerator Tank Replacement
Post-Bid
$700,000 to $750,000 est. value
Charleston, SC 29425

UST Corrective Action at Site #01589, Circle K 2720886
Results
Less than $1,646,000 est. value
Ravenel, SC 29470

Diesel Fuel Tank Cleaning
Term Contract
Post-Bid
Charleston, SC 29425

Gas Service Lines Installation
Results
Greenville, SC

Installation of an Emergency Stop Panel
Post-Bid
Charleston, SC

Rental Car Fuel Facilities Tank Replacement Project
Results
West Columbia, SC 29170

North Tower Gas Line Replacement
Post-Bid
$25,000 to $30,000 est. value
Columbia, SC 29201

Replace Felt on 18,000 GAL Propane Tank
Results
Less than $12,678 est. value
Columbia, SC 29210

Last Updated 01/06/2020 02:07 PM
Project Title

B1955 Install Natural Gas Line

Physical Address View project details and contacts
City, State (County) Shaw Air Force Base, SC 29152   (Sumter County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install and furnish plastic gas pipe to connect from the existing gas main to B1955. The installation of the gas pipe shall be approximately 860' of 4" gas pipe along the roadway and approximately 215' of 2" gas pipe to the building and cap 4" pipe for future use. Provide and installation a smart meter and regulator. Tie-in government furnished tankless water heaters. The area around the facility contains geothermal wells. The installation shall be bored to avoid disturbing of the wells.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Natural-Gas Distribution, Natural-Gas Metering.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents