Similar Projects
Right of Way - SH076
Infrastructure
Conception
$1,250,000 CJ est. value
Blanchard, OK 73010

Right of Way - SH059
Infrastructure
Conception
$800,000 CJ est. value
Wayne, OK 73095

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain, Bridge and Surface - SH 24
Infrastructure
Design
$2,300,000 CJ est. value
Purcell, OK 73080

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Pennsylvania Avenue Bridge Water Line Relocation
Infrastructure
Results
$200,000 est. value
OK

Interchange, Grade, Drain, Surface, And Bridge
Infrastructure
Results
$105,183,719 CJ est. value
Purcell, OK 73080

Right of Way - IS035
Infrastructure
Conception
$500,000 CJ est. value
Purcell, OK 73080

Utilities - SH 76
Infrastructure
Design
$500,000 CJ est. value
Blanchard, OK 73010

Starbucks #67888 / Purcell
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Purcell, OK 73080

Section Line Road Paving Improvements
Infrastructure
Results
$3,491,285 CJ est. value
Blanchard, OK 73010

Grade, Drain, Bridge and Surface - IS 35
Infrastructure
Design
$24,000,000 CJ est. value
Purcell, OK 73080

Newcastle Animal Shelter
New Construction, Infrastructure - 4,394 SF
Post-Bid
$200,000 CJ est. value
Newcastle, OK 73065

Sanitary Sewer Improvements Tri-City Sewer Line Extension
Infrastructure
Results
$696,547 CJ est. value
Newcastle, OK 73065

Last Updated 07/21/2023 05:33 PM
Project Title

Water System Improvements I-35 and Sh 9 Water Line Relocation

Physical Address View project details and contacts
City, State (County) Goldsby, OK 73093   (McClain County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $335,450 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include constructing approximately 2,600 l.f. of 4''-8'' PVC Water Line, and appurtenances. All work shall be performed, and all construction and material used and furnished shall be in accordance with the Contract Documents prepared by Glenn Sullivan & Associates, Inc., and on file in the office of the Goldsby Public Works Authority, located at Town Hall. The Notice to Bidders, Form of Bid, Form of Contract, Plans and Specifications, Forms of Bid Bond, Performance and Statutory Payment Bond, and other Contract Documents may be examined at the following. The time for completion is 60 calendar days Each bidder shall accompany his original bid, with a certified or Cashier's Check on a solvent bank located in Oklahoma or a Bidder's Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said plans and specifications and furnish the required bonds within seven (7) days after the acceptance of his bid. The deposit will be retained by the Owner as, and for, liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. A Performance, Maintenance and Statutory Bond in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract, and the bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded to him. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. Liquidated damages will be $300.00 per calendar day. The Contractor will be required to begin work within 14 calendar days of the date shown on the Notice to Proceed. The time for completion is 60 calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents