Similar Projects
Last Updated | 10/10/2022 06:34 AM |
Project Title | RFP Construction Manager - CM/GC Services for Loafer Mountain Parkway Project |
Physical Address | View project details and contacts |
City, State (County) | Salem, UT 84653 (Utah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected February 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PN-201813 Utah County is seeking to enter into an agreement with a qualified and motivated Construction Manager/General Contractor (CM/GC) firm to provide Construction Manager/General Contractor services to assist the County and the County's contracted Engineers (Project Engineering Consultants - PEC) to finalize design and construct the Loafer Mountain Parkway project. The project will construct a new roadway providing improved connection for the cities of Salem and Elk Ridge to SR-164, improving the access to I-15. The project will construct a new roadway providing improved connection for the cities of Salem and Elk Ridge to SR-164, improving the access to I-15. The main elements of the project consist of the following construction activities: 1. Construct a new 3-lane road (Loafer Mountain Parkway) between SR-164 and SR198 (approximately 2.75 miles). 2. Extend 400 North to intersect with Loafer Mountain Parkway (approximately .30 miles). 3. Improve, with minor widening, SR-164 from the new intersection with Loafer Mountain Parkway to the I-15 interchange (approximately .58 miles). 4. Install a signal at the intersection of SR-164 and Loafer Mountain Parkway. 5. Improve the intersection at SR-198 including the installation of a signal. 6. Reconstruct and widen Elk Ridge Drive from SR-198 to 11200 South (approximately 1.5 miles) including a realignment of Salem Canal Road (approximately .25 miles). 7. Install drainage features including trunk lines, roadside ditches, retention/detention ponds, and irrigation ditches and roadway crossings at multiple locations. 8. Install one 4-sided box culvert (16' x 6' x 120') carrying Loafer Mountain Parkway across Beer Creek, one 3-sided box culvert (12' x 5' x 104') within the wetland mitigation site, and a pedestrian box culvert (12' x 10' x 165') under the intersection of Salem Canal Road. 9. Construction of a wetland mitigation site (approximately 20 acres). 10. Install all fences, gates, driveways, utility connections, and other features as defined in the plans. October 4, 2022 Final Date to Submit Questions Question Submission Close Date 10/4/2022 5:00 PM MDT |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |