Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

600 South Sidewalk - 1100 West To 1600 West - City Of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

5600 North / University Avenue Traffic Light - City of Provo
Infrastructure
Conception
$2,400,000 est. value
Provo, UT 84604

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

2021 Roadway Paving Project
Infrastructure
Post-Bid
Woodland Hills, UT

Last Updated 10/10/2022 06:34 AM
Project Title

RFP Construction Manager - CM/GC Services for Loafer Mountain Parkway Project

Physical Address View project details and contacts
City, State (County) Salem, UT 84653   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PN-201813 Utah County is seeking to enter into an agreement with a qualified and motivated Construction Manager/General Contractor (CM/GC) firm to provide Construction Manager/General Contractor services to assist the County and the County's contracted Engineers (Project Engineering Consultants - PEC) to finalize design and construct the Loafer Mountain Parkway project. The project will construct a new roadway providing improved connection for the cities of Salem and Elk Ridge to SR-164, improving the access to I-15. The project will construct a new roadway providing improved connection for the cities of Salem and Elk Ridge to SR-164, improving the access to I-15. The main elements of the project consist of the following construction activities: 1. Construct a new 3-lane road (Loafer Mountain Parkway) between SR-164 and SR198 (approximately 2.75 miles). 2. Extend 400 North to intersect with Loafer Mountain Parkway (approximately .30 miles). 3. Improve, with minor widening, SR-164 from the new intersection with Loafer Mountain Parkway to the I-15 interchange (approximately .58 miles). 4. Install a signal at the intersection of SR-164 and Loafer Mountain Parkway. 5. Improve the intersection at SR-198 including the installation of a signal. 6. Reconstruct and widen Elk Ridge Drive from SR-198 to 11200 South (approximately 1.5 miles) including a realignment of Salem Canal Road (approximately .25 miles). 7. Install drainage features including trunk lines, roadside ditches, retention/detention ponds, and irrigation ditches and roadway crossings at multiple locations. 8. Install one 4-sided box culvert (16' x 6' x 120') carrying Loafer Mountain Parkway across Beer Creek, one 3-sided box culvert (12' x 5' x 104') within the wetland mitigation site, and a pedestrian box culvert (12' x 10' x 165') under the intersection of Salem Canal Road. 9. Construction of a wetland mitigation site (approximately 20 acres). 10. Install all fences, gates, driveways, utility connections, and other features as defined in the plans. October 4, 2022 Final Date to Submit Questions Question Submission Close Date 10/4/2022 5:00 PM MDT

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents