Similar Projects
Dunbar Creek Flood Protection Project
Bidding
$500,000 to $1,000,000 est. value
Dunbar, PA 15431

Culvert Contract
Post-Bid
Northumberland, PA

Culvert Pipe
Post-Bid
PA

AMR McGarey South
Results
PA

AMR, Little Bear Creek East
Results
PA

Structure Replacement of a Culvert
Post-Bid
PA

West Ore Street Drainage Improvements
Results
Less than $75,000 est. value
Loganville, PA

Frosty Hollow Road Culvert Replacement Project
Post-Bid
Woodbury, PA

The Replacement of a Culvert on Erickson Road
Results
Ulysses, PA 16948

7,653 LF 6 Inch Pipe Underdrain, Installed
Post-Bid
PA

2018 Union Township Drainage Improvements Project
Results
Finleyville, PA

Reese Road Culvert Replacement and Haines Road Culvert Replacement
Post-Bid
Buffalo, PA

Green Park Basin BMP Retrofit
Results
$130,000 to $140,000 est. value
Manheim, PA 17545

Carrie Furnace Redevelopment Project - Stormwater Basin Modification
Post-Bid
PA

Meadow Brook - Flood Control
Results
Less than $6,210,000 est. value
Meadowbrook, PA

Last Updated 09/18/2019 07:49 AM
Project Title

Stetter Road Structure Replacement

Physical Address View project details and contacts
City, State (County) Bellwood, PA   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $409,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Includes replacing two existing corrugated metal pipes. The South portion of the project involves replacing an existing 71"W x 47"H corrugated metal pipe with a 98"W x 63"H Reinforced Concrete Elliptical Pipe, including reinforced concrete headwalls. The North portion of the project involves replacing an existing 64"W x 43"H corrugated metal pipe with a 10`-0"W x 4`-0"H Precast Concrete Box Culvert, including precast end sections. Approach roadway construction with traffic safety features, traffic control, and erosion and sedimentation pollution control will also be included.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents