Similar Projects
Y--Zion-New Water System at Kolob Canyons
Design
$1,000,000 to $5,000,000 est. value
Denver, CO

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Construction Services for 2.0MG Elevated Tank
Results
Brighton, CO 80601

Water World Alpine Springs Excavation and Pipelines
Results
Federal Heights, CO 80260

J099-- Underground Storage Tank Repair Services -554
Post-Bid
Aurora, CO 80045

Expansion Tank Bladder Replacement
Results
Less than $8,000 est. value
Westminster, CO 80031

COANG Fuel Storage Tank
Post-Bid
Aurora, CO 80011

Griswold WPF Finished Water Reservoir Repairs Project
Results
Aurora, CO

Z--Bgndrf Glass Fused to Steel Storage Tanks Maintenance and Repairs
Post-Bid

Underground Storage Tank Repairs
Post-Bid
Denver, CO 80225

Griswold Water Purification Facility Surge Tank Improvement
Post-Bid
$3,000,000 to $4,200,000 est. value
Aurora, CO

Tank Painting and Repairs 136th Avenue and Garfield Street Tank
Term Contract
Post-Bid
Thornton, CO 80601

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Last Updated 09/23/2021 10:51 AM
Project Title

Griswold WPF Finished Water Reservoir Repairs and Clearwell Valve Replacement

Physical Address View project details and contacts
City, State (County) Aurora, CO 80014 (Adams, Arapahoe Counties)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,600,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Based on a comprehensive inspection and condition assessment of the 15 million gallon (MG) finished water reservoir in 2019/2020, multiple repairs and improvements were identified including the following: Demolition of the existing wood gates, stems, and appurtenances; Removal of corrosion and repair of concrete twin tees and concrete beams; Removal of the existing coating on the inlet and outlet steel standpipes and associated structural platform support and re-coating; Removal of the existing coating on the overflow pipe and vent pipe and recoating; Replacing the 18” drain valve and appurtenances; Installing support brackets under the twin tee stems at the north and south sides of tank where the twin tees rest on wall; Removing the existing cathodic protection anodes from inlet and outlet standpipe and replace with new anodes; Repair of the corrosion on the handrail around standpipe platform; Removal of the coating that is flaking off all concrete column bases; and Gate structure hatch replacement. The project also includes the replacement of the four 36-inch diameter clearwell valves, which have reached the end of their useful life. The valves will be replaced with new 36-inch butterfly valves with electric actuators, which have been pre-purchased by the City. Other minor improvements will include the relocation of the chemical injection points for sodium hydroxide inside the finished water pipe located below the concrete floor of the pipe gallery.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents