Similar Projects
I-95 SB over Bagshaw Swamp
New Construction
Conception
$4,309,000 est. value
Ridgeland, SC 29912

Bridgeway Station Master Development
New Construction - 378,000 SF
Design
$150,000,000 est. value
Mauldin, SC

US 301 Over North Edisto River and Swamp
New Construction, Infrastructure
Design
$27,691,000 est. value
Orangeburg, SC 29118

Bridge Maintenance - US 1 / SC 9
Infrastructure
Bidding
Bennettsville, SC 29512

Bridge Replacement - SC 85 (Southern R.R). and S-995
New Construction
Post-Bid
SC

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Valencia Road Bridge
Results
$900,000 est. value
Ridgeway, SC 29130

Bridge Maintenance - I-526 (Wando River)
Results
SC

I-95 NB over Bahama Swamp and Bagshaw Swamp - Bridge Preservation (Jasper County)
Infrastructure
Design
$4,309,000 est. value
Ridgeland, SC 29912

Saluda Shoals Front Bridge and Over Look Repair
Post-Bid
$22,000 est. value
Columbia, SC 29212

Melvin Hill Road Bridge
Results
Campobello, SC 29322

Bridge D5 Dillon County
New Construction, Term Contract
Post-Bid
SC

Bridge - Union County
Term Contract
Results
SC 29379

Bridge Replacement - US 1 (SCL RR)
New Construction, Infrastructure
Post-Bid
$13,320,000 est. value
SC

On-Call Bridge Repair Clarendon
Term Contract
Results
SC

Last Updated 06/22/2022 02:26 AM
Project Title

Grand Linear Park Pedestrian Bridge

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC   (Horry County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct two (2) pre-engineered manufactured pedestrian bridge foundations. If contaminated groundwater is encountered, work should be halted and the contractor shall notify the Owner, the Engineer, and SCDHEC immediately to allow evaluation of conditions by the Engineer, or his agent, and SCDHEC. No groundwater should be pumped, bailed, or otherwise discharged from the excavation. Any equipment or materials which come in contact with groundwater should not be removed from the immediate work area until potential levels of contamination have been assessed. 2. The proposed line being laid should be immediately sealed to prevent potentially contaminated water from flowing into the pipe. All workers should leave the excavation. Any equipment or other articles which have come into contact with the groundwater should be flushed with fresh water. 3. Samples of the groundwater will be collected by the engineer or his agent for testing. The constituent to be determined in the testing regime will be based upon the location with respect to the currently identified SWMUs (Solid Waste Management Units). Testing could include but is not limited to hydrocarbons, solvents, heavy metals, herbicides and pesticides. A work stoppage of 3 days should be anticipated for each such event. 4. If no contaminants are found, work can proceed. The volume of groundwater pumped from the excavation should be minimized. The engineer or his agent will sample periodically to determine if contamination is being transported from the SWMUs to the excavation via groundwater movement. 5. If the contamination is detected in the groundwater, any water removed from the excavation must be properly collected and stored for treatment. This collection will be undertaken by a qualified environmental contractor retained and paid for by the owner.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents