Similar Projects
FY 2020 Wastewater Treatment Facility Upgrades
Renovation
Bidding
$200,000 est. value
Waycross, GA

Flowery Branch WRF Upgrade to 2.2-MGD
Renovation
Bidding
$3,000,000 est. value
Flowery Branch, GA

SCWRF Vent and Flare System
New Construction
Post-Bid
Columbus, GA 31901

Flat Creek WRF Clarifier Renovation
Renovation
Post-Bid
Gainesville, GA 30504

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Interstate Centre WWTF and LAS Expansion
Renovation, Addition
Results
Richmond Hill, GA 31324

Parkstone Wastewater Treatment Plant Phaseout
New Construction
Bidding
$30,000 est. value
Cumming, GA 30028

North Oconee WRF and Middle Oconee WRF Improvements
Renovation
Post-Bid
$23,000,000 to $26,000,000 est. value
Athens, GA 30605

Professional Operations, Maintenance and Management Services
Results
GA

Water and Sewerage Authority (WSA) Office Facility
New Construction - 38,896 SF
Bidding
$10,000,000 est. value
Jefferson, GA 30549

US-78 Lanier Sewer Pump Station Decommissioning
Demolition
Post-Bid
GA

F. Wayne Hill WRC Backwash Tank Deck Replacement
Results
Buford, GA 30519

F. Wayne Hill Water Resources Center and Yellow River Water Reclamation Facility Primary Clarifier Rehabilitation
Renovation
Bidding
$1,000,000 est. value
GA

NCWRF and SCWRF Structural Assessments and Repairs
Renovation
Post-Bid
Columbus, GA 31904

Shakerag Water Reclamation Facility Membrane System Expansion
New Construction
Results
Suwanee, GA

Reported 06/16/2022 12:00 AM
Project Title

Solids Dewatering System for the Shenandoah Wastewater Treatment Facility (WWTF)

Physical Address View project details and contacts
City, State (County) Newnan, GA   (Coweta County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed improvements to the facility include improvements to the existing influent pump station, new headworks, new aeration basin, improvements to the existing aeration basin (fine bubble diffusers, mixers, and BNR), new final clarifiers, new RAS/WAS pump station, additional (new) tertiary filters, new UV disinfection, new cascade (post) aeration, conversion of the existing final clarifiers to aerobic digesters, new solids dewatering facilities and a new biosolids drying facility.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents