Similar Projects
MBC Salon
Renovation
Conception
Charleston, WV 25301

Dollar General - Middleway Pike
New Construction - 9,100 SF
Conception
Bunker Hill, WV 25413

Walmart Supercenter #1450-276 - Smart Bundle
Renovation - 208,208 SF
Design
Ripley, WV 25271

Walmart Supercenter #1499-280 - D80 BLST CHIL
Renovation - 146,397 SF
Design
Lewisburg, WV 24901

Capitol Market Restroom Renovations
Renovation
Bidding
$200,000 CJ est. value
Charleston, WV 25301

Harbor Freight Tools / Fairmont
Renovation - 16,878 SF
Bidding
$300,000 CJ est. value
White Hall, WV 26554

Family Dollar #25891
Addition - 8,789 SF
Post-Bid
Rock Cave, WV 26234

Walgreens #17534
Renovation
Post-Bid
Branchland, WV 25506

1055 Market Street
Renovation
Results
WV 26003

Remedial Excavation and Corrective Action French's Kwick Mart 99-111
Infrastructure
Results
$186,124 CJ est. value
Hedgesville, WV 25427

Walmart Supercenter #2610-242 - Entertainment Optimization
Renovation - 201,638 SF
Construction
Logan, WV 25601

Family Dollar
Renovation - 11,734 SF
Construction
$589,000 est. value
Ravenswood, WV 26164

Market Street Retail
Demolition, New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Wheeling, WV 26003

Starbuck's & Retail
Demolition, New Construction, Infrastructure - 4,319 SF
Pending Verification
$1,200,000 CJ est. value
Wheeling, WV 26003

Dollar General - Shepherdstown Pike
New Construction - 10,640 SF
Conception
Martinsburg, WV 25404

Last Updated 04/24/2023 04:20 PM
Project Title

O'Reilly Auto Parts (CWV) / Clarksburg

Physical Address View project details and contacts
City, State (County) Clarksburg, WV 26301   (Harrison County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status Construction Nearing Completion, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the interior renovation for an auto parts store. As of April 24, 2023, construction is 80% complete, and is expected to be finished by late-May 2023. *This project has been awarded and all trades have been let.

Details

1 Story Above Grade, Renovation, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents