Similar Projects
Liquefied Natural Gas Terminal
New Construction, Infrastructure
Conception
$1,000,000,000 CJ est. value
Calais, ME 04619

Liquefied Natural Gas Terminal
New Construction, Infrastructure
Conception
$1,000,000,000 CJ est. value
Calais, ME 04619

Harrington Family Health Center Addition and Renovation Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Harrington, ME 04643

Sewer Service Pump Replacements
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Indian Twp, ME 04668

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Large Culvert Replacement
Results
Columbia, ME 20588

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Town of Lubec Septic System Bid
Infrastructure
Construction
$22,500 CJ est. value
Lubec, ME 04652

Town of Lubec Septic System Bid
Infrastructure
Construction
$22,500 CJ est. value
Lubec, ME 04652

Kingfish Zeeland North American Recirculating Aquaculture System / Jonesport
New Construction, Infrastructure - 573,500 SF
Pending Verification
$110,000,000 CJ est. value
Jonesport, ME 04649

Paving School Roads and Parking Areas
Infrastructure
Post-Bid
$400,000 est. value
Calais, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Water Filtration System
Infrastructure
Post-Bid
$250,000 est. value
Calais, ME 04619

Main Street Utility Upgrades
Infrastructure
Results
Calais, ME

Last Updated 01/18/2023 02:38 PM
Project Title

Old Toll Bridge Road Improvements

Physical Address View project details and contacts
City, State (County) Eastport, ME 04631   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements will be made on Old Toll Bridge Road for demolition and reconstruction of approximately 700 feet of roadway and construction of an open bottom concrete crossing in place of an existing culvert. Work to include excavation, placing and grading of fill material to raise the road grades, construction of gravel base, placement of pavements, installation of piping, placement of drainage, seeding and mulching, riprap protection on the roadside slopes, paving of approximately 700 feet, guardrail, and required erosion control measures. A certified check or bank draft payable to the City of Eastport or a satisfactory bid bond executed by the bidder and surety company in the among equal to five percent (5%) of the bid shall be submitted with each bid. The successful bidder will be required to provide a contract performance surety bond and a contract payment surety bond, each for 100 percent of the contract price. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the City of Eastport. The project is entirely or partially funded with CDBG funds through the State of Maine Department of Economic and Community Development Maine Decision Number ME20210027. The bidder's attention is called to the Federal Conditions, Federal Labor Standard Provisions and the Wage Rate Schedule included in these contract documents. Should a discrepancy exist between the Supplemental Federal Conditions, Federal Labor Standard Provisions and the Wage Rate Schedule and the other sections of the contract documents, the Supplemental Federal Conditions, Federal Labor Standard Provisions and Wage Rate Schedule shall apply. The "State of Maine, Department of Transportation, Standard Specifications, Revision of March 2020" and Portland Water District Construction Specifications will govern all work. The owner reserves the right to reject any and all bids, to waive any and all informalities and to negotiate contract terms with the successful bidder, and the right to disregard all non-conforming, non- responsive or conditional bids. Discrepancies between words and figures will be resolved in favor of words. Completion Date: August 30, 2023 - Surface Pavement Complete September 30, 2023 - substantial completion.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents