Similar Projects
Rapid City Firearms Range Complex
New Construction
Conception
SD

Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Rapid City Firearm Range
New Construction
Design
Rapid City, SD

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Replace Stuctures and Approach Grading
Demolition, New Construction, Infrastructure
Bidding
$3,243,000 CJ est. value
New Effington, SD 57255

Remove & Replace PCC Surfacing, Replace Str, Grading, Pipe Work
Infrastructure
Bidding
$32,629,000 CJ est. value
Humboldt, SD 57035

25-Bed Adult Detention Center Design-Build and Construction Administration Services
New Construction - 12,800 SF
Post-Bid
Agency Village, SD

25-Bed Adult Detention Center Design-Build and Construction Administration Services
New Construction - 12,800 SF
Post-Bid
Agency Village, SD

Harrisburg Schools 4th Addition Mass Grading
Infrastructure
Results
Sioux Falls, SD 57109

Lennox 4-H Site Grading Improvements
Infrastructure
Results
$125,000 est. value
SD

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Contractor - Picnic Shelters
New Construction
Design
$200,000 est. value
Flandreau, SD 57028

Last Updated 09/27/2022 01:43 PM
Project Title

Gene Brownell Athletic Complex Renovations

Physical Address View project details and contacts
City, State (County) Aberdeen, SD 57401   (Brown County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $140,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For Gene Brownell Athletic Complex Renovations Technical questions shall be directed to CO-OP Architecture, LLC, Aberdeen, South Dakota at 605-262- 0377. (Attn: Kody Schochenmaier) or via email (kody@co-oparch.com) Bids shall be submitted to the Aberdeen School Board in a sealed envelope with the name and address of the bidder clearly identified on the envelope and the words "Bid for Aberdeen School District -Gene Brownell Athletic Complex Renovations Project". All bidders shall take note of the General Conditions of the Contract for Construction, and the Supplementary Conditions, which are part of the Construction Documents. Faxed bids will not be accepted; however, faxed bid adjustments will be accepted until the time of bid opening. Faxed adjustments must be followed up with a signed hard copy mailed to Aberdeen Schools District Service Center - Attn: Ben Schnell. Fax adjustments to 605-725-7198. Complete bids will be accepted for each bid or alternate (all general, material and labor) as required to provide the complete project. No bidder may withdraw a bid for 30 days following the bid opening without a written request explaining the cause of the withdrawal and without written consent of the Owner after reviewing the cause. Liquidated damages shall be in effect for this project. See Bid Form, Agreement for Construction and the General Conditions for details. If bids exceed $50,000, each bid must be accompanied by a certified check, cashier's check or draft in the amount of 5% of the base bid plus all add alternates, or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to the "Aberdeen School District 06-1, Aberdeen, South Dakota." The Aberdeen School Board reserves the right to accept or reject any or all bids and to waive any irregularities therein. Commencement of Contract: On or near October 11th, 2022 Commencement of Construction: October 17th, 2022 Certificate of Substantial Completion: March 31st, 2023 Final Completion: April 10th, 2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents