Similar Projects
Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Parleys Way Crosswalk Enhancements and Pedestrian Safety Improvements
Post-Bid
Salt Lake City, UT 84114

Holladay Safe Routes to School Safe Routes to Schools/Pedestrian/Bicycle Safety
Results
Less than $500,000 est. value
UT

SR-85; MP 3.52-20.84, Various Improvements HSIP - Highway Safety Improvement/Intersection Improvement
Results
$1,500,000 to $3,000,000 est. value
UT

Quarry Bend Park - Sidewalk and Retaining Wall
Post-Bid
Sandy, UT 84070

2020 Murray City Concrete Repair
Results
Less than $977,030 est. value
Murray, UT 84107

6000 West Pre-Cast Fence and Sidewalk
Post-Bid
Herriman, UT 84096

Improvements to Parking Lot 10
Results
Less than $95,000 est. value
Salt Lake City, UT 84112

SLC Airport Parking Lot E Pedestrian Canopy
Post-Bid
Salt Lake City, UT 84122

Terra Linda Parking Lot Enhancement
Results
West Jordan, UT 84088

Slc Airport Aoc Vehicle Canopy
Post-Bid
Salt Lake City, UT 84122

South Salt Lake City Fire Station 42 Parking Lot Reconstruction
Results
$150,000 to $200,000 est. value
Salt Lake City, South Salt Lake, UT

Station 115 Parking Lot Concrete Repair
Post-Bid
UT 84006

Copper Hills High School Parking Lot
Results
West Jordan, UT 84081

City Wide Park Walkway Safety SLC Library Plaza Paver Replacement
Post-Bid
Salt Lake City, UT 84111

Last Updated 07/20/2021 08:20 AM
Project Title

DFCM Construction - Pre Qualified Paving - DFCM TSOB Pavement Upgrades

Physical Address View project details and contacts
City, State (County) Taylorsville, UT 84129   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to replace old asphalt and improve drainage in the parking lot. Sawcut existing asphalt; Remove existing asphalt pavement; Remove existing road base / subgrade to 11" below finish grades; Remove and dispose of existing bike racks; Sawcut and remove existing curb and gutter; Sawcut and remove existing sidewalks; Cut and remove existing tree roots; Over excavate an additional 12" of soft subgrade and fill with pit-run material; Provide and install stabilization fabric; Sawcut top of existing catch basins to install concrete apron with new grate and frame; Provide and install new curb & gutter; Provide and install new 3'-0" wide concrete waterway; Provide and install ADA accessible ramp; Install 8" road base; Install 3" asphalt; Install 4" wide parking stall striping; Flush system and clean-out debris from existing storm drain catch basins; Misc. repair sod, added topsoil, sprinkler system, etc. in areas of construction as needed; General Conditions; Project mobilization; Erosion control, sweep, and dust control; Construction survey and staking; Traffic control and pedestrian safety.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents