Similar Projects
Main St Curb and Sidewalk
Infrastructure
Conception
$999,810 CJ est. value
Bird in Hand, PA 17505

Fivepointville Road Bridge
Infrastructure, Renovation
Conception
$750,000 CJ est. value
Denver, PA 17517

Blue Bell Mobile Home Park
New Construction
Design
Ephrata, PA 17522

Circle M RV Campground and Resort
Renovation
Design
Lancaster, PA 17603

Meadowbrook Area Sanitary Sewer and Water Main Rehabilitation/Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Denver, PA 17517

Meadowbrook Area Sanitary Sewer and Water Main Rehabilitation/Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Denver, PA 17517

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Replacement Project
Infrastructure
Post-Bid
Lancaster, PA

Sidewalk, Curb and Drainage Maintenance on East Main Street (SR 772) and North Water Street (SR 1035) and Watermain Replacement on Water Street Roadway and Reconstruction
Results
Lititz, PA 17543

Construction of New Water Meter Pit at Penn Manor High School - General Construction
Results
Millersville, PA 17551

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

Butter Road over Kurtz Run
Infrastructure, Renovation
Conception
$184,971 CJ est. value
Bird in Hand, PA 17505

Townstead Apartments at Homestead Village
Addition, Demolition, Infrastructure
Design
$45,000,000 CJ est. value
Lancaster, PA 17603

Market Street Bridge
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Elizabethtown, PA 17022

Last Updated 09/14/2022 09:31 AM
Project Title

Sewer and Water Extension to Pequea Valley High School

Physical Address View project details and contacts
City, State (County) Gordonville, PA 17529   (Lancaster County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,327,479 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project generally consists of 5,000 LF of 10" HDPE water main directionally drilled, (10) fire hydrants, (6) gate valves, (1) tee, and (1) 10" to existing 8" connection, (1) stream crossing; and 5,200 LF of 3" HDPE low pressure sewer main directionally drilled, (13) cleanout/air release manholes, (1) connection to existing discharge manhole, (1) stream crossing; and restoration to areas disturbed by construction operations. CLARIFICATION DEADLINE 7/20/2022 5:00 PM Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. The Contract will be subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania, Department of Labor and Industry. Each Bid must be accompanied by Bid security in the form of a certified check, bank check, irrevocable letter of credit, or Bid bond (on the form included with the Bidding Documents) for (10) percent of the Bid total. It is a requirement of this Contract that at least 50% of the Work be performed by prime Bidder's own work force, not by subcontractor(s). It is a requirement of this Contract that Bidder shall have a minimum (5) year, (10) project documented experience in the type of Work required by this Project. Bidders, subcontractors, their workers and any persons providing labor and products to the Project shall be persons lawfully permitted to work in the United States and the Commonwealth of Pennsylvania. As a precondition of being awarded a Contract, Successful Bidder, and its subcontractor(s) are required, to provide confirmation of compliance with Act 127 of 2012, the "Public Works Employment Verification Act". The OWNER hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents