Similar Projects
43RD Avenue Traffic Signal Upgrades
Infrastructure
Bidding
Phoenix, AZ 85042

Vistancia Traffic Signals
Post-Bid
Scottsdale, AZ

LED Modules for Traffic Control Signals
Term Contract
Post-Bid
Mesa, AZ

Professional Services - Alma School Road Improvements (Pecos To Germann) And Gilbert Road Improvements
Results
Chandler, AZ

System Enhancement (Safety Improvements)
Results
Less than $1,300,000 est. value
AZ

Construct Traffic Interchange
Results
Less than $32,366,000 est. value
Gilbert, AZ 85233

Traffic Signal Loop Detection Installation Services
Term Contract
Results
Mesa, AZ 85211

CFD Phase XVI Offsite and Onsite Roadway Improvements and Traffic Signal Modifications
Results
Less than $3,670,408 est. value
Mesa, AZ

Traffic Signal and Street Light Poles and Components
Term Contract
Results
Phoenix, AZ

Traffic Control for Spring Training and Other Events
Term Contract
Results
$25,000 est. value
Peoria, AZ

Dysart Road-Acoma Drive Traffic Signal Project
Results
El Mirage, AZ 85335

63rd Avenue and Northern Avenue Traffic Signal
Results
Glendale, AZ 85301

Baseline Road at Meridian Road Roadway Signage
Results
AZ

Traffic Signal Maintenance
Infrastructure
Results
El Mirage, AZ

Phase XVIII Traffic Signal At Point Twenty-Two Blvd and Everton Terrace
Infrastructure
Results
$360,000 est. value
Mesa, AZ 85212

Reported 02/23/2022 12:00 AM
Project Title

Traffic Signal Maintenance Services

Physical Address View project details and contacts
City, State (County) Mesa, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract is for the maintenance, modification, and installation, of the City’s Intelligent Transportation System (ITS) Traffic Signals and related ITS equipment. Work will be accomplished throughout the City on an as-needed, where-needed basis. Work will consist of but not be limited to: foundation installation/removal, light and signal pole installation/removal, arm and head installation/removal, trenching, boring, conduit/wire/cable installation/removal, pull box/vault installation/removal, temporary traffic control, saw cutting, signal LED replacement, traffic loop installation, Fiber Optic installation, etc.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents