Similar Projects
Last Updated | 10/11/2022 10:32 AM |
Project Title | Restroom Renovation Projects At Morris Hills High School and Morris Knolls High School |
Physical Address | View project details and contacts |
City, State (County) | Rockaway, NJ 07866 (Morris County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $678,375 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project no-2202063 Morris Hills and Morris Knolls High School Restroom Renovation Project The Project consists of renovations to existing restrooms at both Morris Hills and Morris Knolls High Schools Removal and replacement of all existing finishes, fixtures, accessories, devices, etc. at 5 restrooms.All other work for a complete installation and as shown on the drawings and specified . Statement of Ownership Requirement: Pursuant to N.J.S.A. 52:25-24.2, Bidders shall submit a statement setting forth the names and addresses of all persons and entities that own ten percent or more of its stock or interest of any type at all levels of ownership. A bidder on a public works project for a Board of Education where the cost of the work exceeds $20,000.00 must first have been qualified by the Department of the Treasury, Division of Property Management and Construction, pursuant to N.J.S.A. 18A:18A-27 through 33, and shall submit with his bid a Prequalification Affidavit No Material Adverse Change, a copy of a valid and active NOTICE OF CLASSIFICATION, a certified copy of a Total Amount of Uncompleted Contracts Form and such Affidavit that subsequent to the latest such statement submitted by him, there has been no material adverse change in his qualification information except as set forth in said Affidavit. Each bid shall be accompanied by a bid bond, cashier's check or certified check made payable to the Morris Hills Regional District Board of Education, for ten percent (10%) of the amount of the total bid, however, not to exceed $20,000.00. Bidders are required by law to submit a Statement of Ownership Disclosure form statement setting forth the names and addresses of all persons and entities that own ten (10%) percent or more of its stock or interest of any type at all levels of ownership. The bid package will also include other documents that must be completed and returned with the bid. Failure to comply with Instructions to Bidders and to complete and submit all required forms may be cause for disqualification and rejection of the bid. All contractors named in this proposal shall possess a valid and current New Jersey Department of Labor and Workforce Development Public Works Contractor's Registration Certificate pursuant to N.J.S.A. 34:11-56.48 et seq., at the time the proposal is received by the Board of Education. The Board of Education reserves the right to reject any or all bids, pursuant to N.J.S.A. 18A:18A-18, N.J.S.A. 18A:18A-2(s), (t), (x), (y), 18A:18A-4(a-c), and N.J.S.A. 18A:18A-22, and to waive minor informalities or non-material exceptions, that may be in the best interest of the Board. 1. Removal of existing finishes, fixtures, and equipment. 2. Modification of existing restroom configurations for accessibility 3. Installation of new finishes, partitions, ceilings, lighting, electric, mechanical, plumbing, fixtures, all accessories and associated work. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |