Similar Projects
Scott, Yates, Lakeview, and Strong Outfalls at Bayou Texar
Results
Pensacola, FL

Whirlpool Road Dirt Road Paving Driveway Pipe
Post-Bid
FL

Bayou Boulevard, Lee, Lloyd and Stanley Street Outfalls to Bayou Texar Stormwater Treatment Enhancement
Results
Pensacola, FL

Escambia County Waste Services HDPE Line Repair and Maintenance
Results
Less than $55,000 est. value
Cantonment, FL 32533

Alcaniz Street Outfall to Pensacola Bay Stormwater Treatment Enhancement
Results
Pensacola, FL 32502

Fairchild Street Swale Upgrade Project
Results
Less than $122,000 est. value
Pensacola, FL 32504

Sharp Point Beach Nourishment Project
Results
Pensacola, FL

Klondike Road at Cedarbrook Estates Pond
Post-Bid
Pensacola, FL 32526

Pensacola Bay Living Shoreline Greenshores II
Results
Pensacola, FL 32502

Burgess Road Sidewalk & Drainage Improvements
Results
Less than $1,570,000 est. value
Pensacola, FL 32598

Crockett Street Drainage Improvements Phase II
Results
Less than $280,000 est. value
FL

Blue Springs Drainage Improvements at Crescent Lake
Results
Less than $373,000 est. value
FL

Stormwater Ponds Maintenance
Results
Pensacola, FL 32502

Clerk Archives Flood Mitigation Project
Results
Pensacola, FL 32501

Washington High School Pond Rehabilitation
Bidding
Pensacola, FL 32504

Last Updated 04/16/2020 12:36 PM
Project Title

Godwin Lane Regional Pond

Physical Address View project details and contacts
City, State (County) FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves drainage improvements along Godwin Lane and converting the existing borrow pit on the North side of Godwin Lane into a Regional Stormwater Pond. Improvements consist of approximately 2,422 linear feet of stormwater pipe with associated drainage structures along with the relocation of an ECUA force main. The project will be partially constructed by a private developer that is currently constructing the Embers Ridge Subdivision on the south side of Godwin Lane.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents