Similar Projects
Bexley North - Infrastructure
New Construction
Design
Inman, SC

Savannah Harbor DMCA 1N Dike Raising
Design
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Ashley Avenue Drainage Project
Post-Bid
Less than $80,000 est. value
Marion, SC 29571

Rights-of-Way Vegetation Management Services 3
Post-Bid

Runway 20 Obstruction Removal
Results
Less than $196,000 est. value
Rock Hill, SC

Median Landscaping - Highway 17 North Project
Results
Georgetown, SC 29442

Calhoun Avenue Drainage Project
Post-Bid
Spartanburg, SC

Northgate/Cobb Road Storm Drainage Rehabilitation
Results
Greenwood, SC

Cherokee Tree Removal
Term Contract
Post-Bid
SC

Animal Control Drain Line Repairs
Results
Newberry, SC

FSR 3010 EROSION REPAIRS
Post-Bid
$25,000 to $100,000 est. value
Edgefield, SC

Benson Campus Under Road Drain Repair
Results
$15,000 to $17,000 est. value
Taylors, SC 29687

Woodcreek Pipe Relocation
Post-Bid
Conway, SC 29528

Drainage Improvements Project at Bryson Elementary School
Results
Simpsonville, SC 29681

On Call Tree Removal
Term Contract
Post-Bid
SC

Last Updated 01/31/2020 04:36 PM
Project Title

Brushy Creek Stabilization

Physical Address View project details and contacts
City, State (County) Greenville, SC 29601   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The required work includes stream stabilization for a 900 foot section of the Brushy Creek located between Seth Street and Mills Avenue. Several large trees will need to be removed and new trees and plant material placed. In-stream vanes will deflect flows away from at risk banks. Coir logs, A-Jaxs will be used to stabilize and protect from undercutting along portions of the reach. Bank grading and different types of erosion control matting will stabilize eroded or graded banks. Stacked boulders, soil lifts and interlocking concrete block will provide additional structural stabilization to the banks where two sanitary sewer lines are exposed. Live staking will take place on the re-established banks.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents