Similar Projects
I-285 WB Ashford Dunwoody Road Ramp Extension
Post-Bid
GA

Centralhatchee Parkway Sidewalk
Post-Bid
Centralhatchee, GA

Blakely Gateway Project
Results
$700,000 est. value
Blakely, GA 31723

Jesters Creek Trail Phase III
Results
Morrow, GA 30260

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Construction Management Services for North Oconee River Greenway
Post-Bid
Less than $2,000,000 est. value
Athens, GA 30603

St. Marys FY 2020 LMIG Project
Results
Saint Marys, GA 31558

Lincoln and Washington Street Resurfacing
Post-Bid
Metter, GA 30439

Tarboro Fire Station 18 Parking Lot
Results
White Oak, GA 31568

Col/Wynne Russell-West Johns Sidewalk
Post-Bid
Lilburn, GA

Jekyll Island Beach Crossover Construction
Results
Brunswick, GA 31527

4th Street Extension/Griffin Street Safety Improvements
Post-Bid
Guyton, GA 31312

Ocmulgee Heritage Trail Connector
Results
Macon, GA 31201

Tree Root Damage Repair
Term Contract
Post-Bid
Savannah, GA

Baymeadows Drive Pedestrian Improvements
Results
Less than $274,869 est. value
Valdosta, GA 31601

Last Updated 04/05/2022 08:44 AM
Project Title

Paving of Walking Trail Phase V

Physical Address View project details and contacts
City, State (County) GA   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,365,074
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work is to furnish labor, tools, materials, equipment, etc., necessary to install trail & site amenities per construction plans, to include grading for trail path, ±7,400 TONS of aggregate base for trail and shoulder construction, ±2,566 TONS of asphalt for a 10-foot wide, 5.26 miles long trail along an abandoned railroad bed, and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings in 180 consecutive calendar days.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents