Similar Projects
Annual Mulch Application
Term Contract
Post-Bid

Mowing Project
Term Contract
Post-Bid

Tree Selection and Replacement for East Ocean Boulevard Streetscape Phase 1
Results
Less than $100,000 est. value
Stuart, FL

Mechanical Site Prep, Land Management and Natural Community Restoration
Term Contract, Infrastructure
Results

Mechanical Scrub Vegitation Treatment Services
Term Contract
Post-Bid
Hobe Sound, FL 33455

Herbicide Application - Treasure Coast Herbicide Primary Roads - Routine Maintenance
Infrastructure
Results
$55,000 est. value

Martin County Airport Landscape Maintenance
Term Contract
Post-Bid
Stuart, FL 34996

Northwest Fork Loxahatchee River (Martin County) Eelgrass Revegetation
Term Contract
Results
$70,000 est. value
Hobe Sound, FL 33455

C-23/24 Canal Sod Installation and Maintenance Services
Alteration
Post-Bid
Okeechobee, FL 34972

Clearing and Grubbing, Fence Upgrade
Infrastructure, Alteration
Results
$500,000 est. value

Grass Seeds
Alteration
Post-Bid

Aquatic Vegetation Management in the NWFWMD, the SWFWMD and the SRWMD
Term Contract
Results
$10,000,000 est. value

Kanner Highway Mixed Use - Phase IA - Site Development
Infrastructure
Post-Bid
$7,529,703 est. value
Stuart, FL 34994

Mowing and Litter
Infrastructure
Results
$100,000 est. value
FL

SECO Energy Storm Rates 2022 (Vegetation/Tree Trimming
Term Contract
Post-Bid

Last Updated 09/09/2022 02:32 PM
Project Title

RFP Engineering - Cove Road From SR-76/Kanner Highway to SR-5/US-1

Physical Address View project details and contacts
City, State (County) Stuart, FL 34997   (Martin County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,185,803 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 9, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 04 Selection Method : Letter of Response and Oral Presentation Professional Liability Insurance : $1,500,000.00 Cove Rd. from SR-76/Kanner Highway to SR-5/US-1 PD&E to Urbanize, Construct median, Increase capacity and Improve mobility. TRC Members (Subject to Change) : James Hughes Shandra Davis Vanita Saini Financial Management Number(s) 441700-1-22-02 Longlist Date/Time 4/19/2022 Shortlist Selection Date/Time 5/02/2022 Oral Presentation Date/Time 5/18/2022 Technical Review Committee Meeting 1 Date/Time 5/24/2022 Final Selection Date/Time 6/06/2022 Negotiations Period Begin Date 6/11/2022 Negotiations Period Ending Date 9/01/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Cove Road From SR-76/Kanner Highway to SR-5/US-1

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents