Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

QSJ RCLR Road Repair
Infrastructure
Post-Bid
$125,000 to $145,000 est. value
Hillsboro, OR 97124

Pavement Maintenance, Installation, Repair and Concrete Grinding Services
Infrastructure
Post-Bid
Hillsboro, OR

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue
Alteration
Results
$7,000,000 to $10,000,000 est. value
OR

2021 ADA Ramps East
Infrastructure
Results
$600,000 to $1,000,000 est. value
OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Hall-Watson Loop Improvements - 5120 - City of Beaverton
Renovation, Infrastructure
Conception
$5,860,000 CJ est. value
Aloha, OR 97007

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Aspahlt Paving and Repair
Infrastructure
Post-Bid
$200,000 est. value
Beaverton, OR

Cornelius Pass Road Arterial Corridor Management Project On The Cornelius Pass Highway (RT. No. OR127) Near Portland
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Last Updated 04/25/2023 08:19 AM
Project Title

2022 Pavement Management Program - Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Tigard, OR 97223   (Washington County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,576,938 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the following: 1. Construction of asphaltic pavement inlays and overlays 2. Asphalt concrete removal (grinding) 3. Applying sealant along pavement edges and joints 4. Temporary signage, protection, and traffic control 5. Striping and pavement markings 6. Construction of concrete curbs ramps and sidewalk 7. Pedestrian signal and push button assembly modifications 8. Performance of additional and incidental work as called for by the specifications and plans. Basis of Bid Award shall incorporate all items identified on the Bid Schedule. Pursuant to Tigard Public Contracting Rule 30.055, all Bidders must submit a Bid security to the City along with their Bid in an amount equal to ten percent (10%) of their Bid. Because the City's estimate of contract value exceeds $100,000, Bidders must submit a First Tier Subcontractor Disclosure Form, provided in this Bid Booklet, to the City no later than 4:00 pm local time, May 26, 2022. The provisions of ORS Chapters 279A and 279C and all other Oregon and Federal provisions pertaining to minimum salaries and wages shall be incorporated by reference as if fully set forth in any Contract resulting from this Advertisement for Bid. Contractor shall provide proof to the City prior to the beginning of any of the work that the Contractor has filed a public works bond with a corporate surety in the amount of $30,000 with the Construction Contractors Board as required under Oregon Prevailing Wage Rate (PWR) law. No Bid will be considered unless fully completed in a manner provided in the Bid Packet. Facsimile Bids will not be accepted nor will Bids be accepted after the stated Bid Closing. Bids received after the Bid Closing will be returned to the submitting firm unopened after a Contract has been awarded for the required services. Bid Documents may be downloaded from the City of Tigard website. The City may reject any Bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all Bids upon a finding of the City if it is in the public interest to do so. All questions about the meaning or intent of the Bid Documents shall be submitted to the Contracts and Purchasing Department at contracts purchasing@tigard-or.gov with any questions. Clarifications to the Bid Documents will be made by addenda only. Oral statements may not be relied upon by Bidders and will not be binding or legally effective.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents