Similar Projects
Redwood Living - Portage - Rental Home Community
New Construction
Conception
Portage, MI 49002

Salt Warehouse/Self-Storage
Renovation
Conception
Southfield, MI

Bearing Service Warehouse
New Construction, Addition - 5,227 SF
Design
$400,000 est. value
Warren, MI 48091

Shamrock Self Storage
New Construction - 125,000 SF
Design
$10,000,000 CJ est. value
Ypsilanti, MI 48197

General Residential Construction Contractor
Term Contract
Bidding
Detroit, MI

2 Concrete Salt Storage Buildings
New Construction
Bidding
Sandusky, MI

Public Storage - Climate Controlled Warehouse
New Construction - 33,274 SF
Post-Bid
Waterford, MI 48328

Cold Storage Building/ 20X48 Pole Building
Post-Bid
Flint, MI 48504

New JROTC Fieldhouse - Phase 1
Results
Flint, MI

Cold Storage Building
New Construction - 4,000 SF
Results
Sandusky, MI

Pinnacle Race Course
New Construction
Construction
$10,000,000 CJ est. value
Huron Township, MI

Neighborhood Storage
New Construction - 32,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Midland, MI 48640

Warehouse Facility
New Construction
Pending Verification
$10,000,000 CJ est. value
Kalamazoo, MI

Covenant Christian High School - Athletic Field Improvements
New Construction, Renovation - 960 SF
Pending Verification
Less than $500,000 CJ est. value
Grand Rapids, MI 49534

Harbor 31 - Dry Dock
New Construction
Conception
Muskegon, MI 49440

Reported 04/06/2022 12:00 AM
Project Title

LISD CSF Livestock Barn

Physical Address View project details and contacts
City, State (County) Adrian, MI   (Lenawee County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Details

New Construction, Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents