Similar Projects
RFP Design - Construction of 3 Bridge Structures - 66th Street South East Railroad Overpass Project
Infrastructure
Conception
$700,000 CJ est. value
Bismarck, ND 58504

RFP Engineering - Burnt Creek River Crossing Within 28th Street NW Project
Infrastructure
Conception
$200,000 CJ est. value
Hay Creek, ND 58503

Bismarck Public Health Facility - Sitework
New Construction - 21,825 SF
Design
Bismarck, ND 58504

Cottonwood Parkview Addition
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Bismarck, ND 58501

ADA Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb and Gutter, Aggregate Base Course
Infrastructure
Bidding
$5,500,000 CJ est. value
Baldwin, ND 58521

Sam McQuade Softball Complex Playground Replacement Project
Infrastructure
Bidding
$300,000 CJ est. value
Bismarck, ND 58501

Pavement Marking
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
Baldwin, ND 58521

Bismarck State College Polytechnic Building Bid Package #2
New Construction, Infrastructure - 80,000 SF
Sub-Bidding
$38,000,000 CJ est. value
Bismarck, ND 58506

Construction Manager at-Risk (CMAR) for Construction of a Polytechnic Building
New Construction
Post-Bid
$35,000,000 est. value
Bismarck, ND 58506

Construction of the Dickinson State University Sports Complex
Renovation
Post-Bid
Bismarck, ND

Old Red Trail Commercial 2nd Addition
Infrastructure
Results
$797,000 to $1,050,000 est. value
Bismarck, ND

Chip Seal Package 2022
Infrastructure
Results
$1,696,042 CJ est. value
Bismarck, ND 58501

Bismarck State College Polytechnic Building - BP #1 (Partial Re-bid)
Demolition, New Construction, Infrastructure
Construction
$38,000,000 CJ est. value
Bismarck, ND 58506

Bismarck State College Polytechnic Building - BP #1 (Partial Re-bid)
Demolition, New Construction, Infrastructure
Construction
$38,000,000 CJ est. value
Bismarck, ND 58506

Marquis Subdivision Self Storage
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Bismarck, ND 58504

Last Updated 02/28/2023 08:38 AM
Project Title

Bismarck State College Polytechnic Building - BP #1

Physical Address View project details and contacts
City, State (County) Bismarck, ND 58506   (Burleigh County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) College/University, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $38,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Construction began November 29, 2022. Method of Delivery: Kraus-Anderson Construction Company has been pre-selected as the Construction Manager/Contractor by Bismarck State College to facilitate the construction of the New Polytechnic Building at Bismarck, ND. 1. This project consists of construction of a new Polytechnic Building along with all associated sitework, relocation of the existing carpentry shop building and construction of a new storage building with a combined area of approximately 89,700 square feet. 2. The work will be issued in a series of phased packages (Bid Package) over the next several weeks / months. 3. The herein referenced documents will enable your firm the opportunity to submit a detailed proposal. We look forward to receiving your Proposal and would like to extend our appreciation for your participation in advance of receiving your proposal on the enclosed Bid Form. G. Work Included in this Offering: We are presently soliciting competitive "Lump Sum Bids" for the following portions of work as defined herein. 1. All portions of the Work as defined in Section 00 2400 2. Site Preparation, Utilities, Mass Excavation, Landscaping and Irrigation, Site Concrete Pavement, Asphalt Pavement, All work associated with the relocation of the existing carpentry shop and construction of the new storage building (BP-1) *Addendum #1 and #2 have been released.

Details

89,700 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents