Similar Projects
Welcome Center to NY Line
Infrastructure
Conception
$3,515,500 CJ est. value
Lawrenceville, PA 16929

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 414 ov W Mill Creek
Demolition, New Construction, Infrastructure
Design
$975,000 CJ est. value
Union Township, PA 16938

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Structural Replacement Bridge No. 16-0013 Cedar Mountain Road Over Cedar Run Forest District 16, Tioga State Forest Elk Township
Infrastructure
Bidding
$500,000 CJ est. value
Elk Township, PA 16921

SR15 Guide Sign Upgrade #2
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Mansfield, PA 16933

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Excavation of a Pipe Replacement on Hilboldt Road
Infrastructure
Post-Bid
Wellsboro, PA 16901

Tioga River to SR 2005
Infrastructure
Conception
$6,800,000 CJ est. value
Richmond Township, PA 16933

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Re-Bid High School Greenhouse at Wellsboro Area HIgh School
New Construction, Infrastructure
Post-Bid
$210,000 CJ est. value
Wellsboro, PA 16901

T-776 over English Run
Infrastructure
Conception
$1,435,000 CJ est. value
Morris, PA 16938

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$5,713,010 CJ est. value
Brecknock Township, PA 19540

SR 2027 over Canoe Camp Creek
Infrastructure
Conception
$1,110,000 CJ est. value
Richmond Township, PA 16933

US 6 and PA 660 Intersection
Infrastructure
Design
$2,897,000 CJ est. value
Richmond Township, PA 16933

Last Updated 11/05/2022 02:33 AM
Project Title

Cummings E High Pressure Pipeline

Physical Address View project details and contacts
City, State (County) Roaring Branch, PA 17765   (Tioga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Request for Proposal for Installation of 6,600 feet of 12” inch steel high pressure natural gas pipeline. The Project includes the following Work: The project construction will consist of a new 12-inch, high pressure pipeline to convey natural gas between the Cummings E well pad and the Huckleberry D Pad. The project is approximately 6,600 feet in length (1,000 feet south of Ogdensburg Road and approximately 5,600 feet North), and is in Union Township, Tioga County, Pennsylvania. The pipeline route has been established and 30% design has been completed and has been permitted. A single, open cut, crossing of Ogdensburg Road will be required for the 12" line. A 16" HDPE water line, with steel risers on each side of Ogdensburg Road, will be installed at the crossing to allow PGE to pump water across the road as required for future operations. The new 12" pipeline will have one foreign line crossing, an uncoated UGI Utilities pipeline. Special requirements exist for pipeline crossing of this line, as well as any vehicle crossing of this UGI line. UGI has significant impressed current cathodic protection (CP) operating on this uncoated line. An existing PGE impressed current CP system will be utilized to protect this new pipeline. CLARIFICATION DEADLINE 11/2/2022 5:00 PM All communications and any inquiries relating to plans, specifications, requests for approvals, and other general information shall be submitted electronically no later than 12:00 Noon Eastern Standard time October 26, 2022. All questions will be filed and available to all parties no later than 5:00 pm Eastern standard time October 28th, 2022. If any omissions from, discrepancies in, or doubt in meaning of any of the RFP documents are found, Bidder should immediately request explanation before submitting Bidder's Proposal. The request shall be made in writing, by PennBid, referencing RFP No. 7021 and identifying the discrepancy. All such requests shall be delivered as directed and must be received no later than five (5) business days prior to the Bid Due Date. The originator of any such request(s) is solely responsible for its timely receipt by PGE via PennBid. If Bidder does not receive a response to a request in time to reflect the response of same when submitting Bidder's Proposal, the interpretation upon which Bidder relies must be set forth in proposed exceptions in accordance (with full RFP Paragraph 4.1.2). PGE reserves the right, at its option, to waive any informalities, irregularities, defects, errors, or omissions in any or all proposals. PGE intends to keep submissions confidential and will take the appropriate action to do so. PGE retains the right to accept or reject any and all proposals without giving a reason for any such acceptance or rejection.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents