Similar Projects
Spot Patching / Pavement Repair - D04 SP FY2021 (East)
Bidding
Ashtabula, Austintown, Berlin, Boardman, Dorset, Jefferson, Plymouth, Youngstown, OH

Paving of Deltona Drive and Delray Drive
Bidding
New Springfield, OH

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

2021 Crack Sealing of Various Roads in Boardman Township
Post-Bid
Boardman, OH

West Wood Street Improvements Project
Results
$240,000 est. value
Lowellville, OH 44436

Bandy Road “Trailstar” Road Improvements
Results
Less than $176,724 est. value
Youngstown, OH 44500

Crack and Joint Sealant (MBE Only)
Term Contract
Bidding

Resurfacing of Various Roads in Boardman Township
Post-Bid
Boardman, OH

Crack Sealing - CS FY2020
Results

Devitt Avenue Resurfacing
Post-Bid
Campbell, OH 44405

MAH CR 117 Meridian Road Phase 2
Results
Less than $3,062,537 est. value
Youngstown, OH 44503

Commercial Asphalt Resurfacing and Striping for the Parking Lots
Post-Bid
Sebring, OH 44672

Two Lane Resurfacing - US 62/Var-09.67/Var
Results
OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Germantown Road Improvements
Results
Less than $172,605 est. value
North Lima, OH 44452

Last Updated 04/29/2021 03:52 PM
Project Title

Stoltz Road Improvements - Phases 2 and 3

Physical Address View project details and contacts
City, State (County) Lake Milton, OH   (Mahoning County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $163,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PHASE 2 includes asphalt resurfacing of Stoltz Road starting at a point (end of Phase 1) 2,030' east of SR 534 (S. Pricetown Road) then heading 2,000' to the ending point. Total PHASE 2 project length is 2,000' (0.38 miles). PHASE 3 includes asphalt resurfacing from Stoltz Road starting at the end of Phase 2 (approximately 4,000' east of SR534) then heading east 2,300' to the Newton Falls Road intersection. Guardrail will be replaced on the existing bridge. Total PHASE 3 project length is 2,300'. Total project length is 4,300'.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents