Similar Projects
HVAC System at Beech Preschool
Bidding
Cortez, CO 81321

Air Conditioner Preventive Maintenance Services
Term Contract
Bidding
Frisco, CO 80443

Renovated Air Filtration System
Post-Bid
Rifle, CO 81650

Z--Romo Beaver Meadows Visitor Center HVAC
Post-Bid
$3,000,000 to $6,000,000 est. value
Estes Park, CO

ERWSD Administration Building - VRF Renovation (Engineer)
Results
Less than $500,000 est. value
Vail, CO 81657

Sustain Repair Air Handler Units - West Fairchild Hall
Results
$1,000,000 to $5,000,000 est. value
Black Forest, CO 80840

Air Handling Units
Bidding
Canon City, CO

Temperature Monitoring System
Post-Bid
Aurora, CO

Repair HVAC Harmon Hall Arnold Hall
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO 80840

General Mechanical / Hvac Construction and Preventative Maintenance Services
Post-Bid
Thornton, CO 80229

SB 267 Repair/Upgrade to Mechanical and Electrical Systems
Results
Less than $155,000 est. value
Fruita, CO 81521

On-Call Test and Balance For HVAC Systems
Post-Bid
CO

Rifle High School Heater Installation
Results
Rifle, CO 81650

Sheriff's Office / Detention Facility Rtu-2 Mammoth Air Handler Replacement
Post-Bid
CO

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Last Updated 01/19/2021 09:11 AM
Project Title

FY21/DQ/PO Industrial Kitchen Blast Chiller for CMHIP NK

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81003   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $120,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Colorado Mental Health Institute at Pueblo’s North Kitchen, located at 1600 West 24th Street, Pueblo Colorado, is in need of one (1) new quick chill unit with the following specifications: 1. Voltage 208-230V, 3 phase, 60 Hz 2. Non CFC insulation construction 3. Magnetic door gasket 4. R-404A Refrigerant 5. Self-contained unit 6. Automatic defrost cycle 7. Rapid chills and freeze capability 8. 11,000+ BTU’s Freeze capacities 9. 21,000+ BTU’s Chill capacities 10. 3000+ CFM air circulation 11. Sealing strip 12. Four (4) adjustable legs 13. One (1) USB port, HACCP data access, three (3) detachable internal-product-temperature probes, 14. Roll in stainless steel pan carts The roll-in pan cart has twenty (20) non-tilt pan support rails set at 22-13/16" (678mm) horizontal width between rails and 2-9/16" (65mm) vertical spacing between rails, ten (10) stainless steel shelves, one (1) removable drip tray and one (1) cart handle. 15. Cabinet exterior with a #4 finish stainless steel front, door, sides and a top insulated with non-CFC foamed-in-place polyurethane. The rear and bottom are galvanized metal. The cabinet interior is stainless steel, including stainless steel air plenums. The door opening perimeter features an ABS thermal break to prevent sweating. The door has a stainless steel exterior with a stainless steel liner, is hinged left as standard. 16. Intuitive control is fully operable from the large touchscreen, and includes 20 preset menu choices. 17. Include delivery charges. 18. Include all parts and labor to install units i.e. electrical hookups, any plumbing connections and/or refrigeration connections in quote. Work to be done by licensed contractor. 19. Awarded vendor to remove and dispose of old units and need to recover refrigerant as per EPA standards.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents