Similar Projects
Last Updated | 01/19/2021 09:11 AM |
Project Title | FY21/DQ/PO Industrial Kitchen Blast Chiller for CMHIP NK |
Physical Address | View project details and contacts |
City, State (County) | Pueblo, CO 81003 (Pueblo County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $120,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Colorado Mental Health Institute at Pueblo’s North Kitchen, located at 1600 West 24th Street, Pueblo Colorado, is in need of one (1) new quick chill unit with the following specifications: 1. Voltage 208-230V, 3 phase, 60 Hz 2. Non CFC insulation construction 3. Magnetic door gasket 4. R-404A Refrigerant 5. Self-contained unit 6. Automatic defrost cycle 7. Rapid chills and freeze capability 8. 11,000+ BTU’s Freeze capacities 9. 21,000+ BTU’s Chill capacities 10. 3000+ CFM air circulation 11. Sealing strip 12. Four (4) adjustable legs 13. One (1) USB port, HACCP data access, three (3) detachable internal-product-temperature probes, 14. Roll in stainless steel pan carts The roll-in pan cart has twenty (20) non-tilt pan support rails set at 22-13/16" (678mm) horizontal width between rails and 2-9/16" (65mm) vertical spacing between rails, ten (10) stainless steel shelves, one (1) removable drip tray and one (1) cart handle. 15. Cabinet exterior with a #4 finish stainless steel front, door, sides and a top insulated with non-CFC foamed-in-place polyurethane. The rear and bottom are galvanized metal. The cabinet interior is stainless steel, including stainless steel air plenums. The door opening perimeter features an ABS thermal break to prevent sweating. The door has a stainless steel exterior with a stainless steel liner, is hinged left as standard. 16. Intuitive control is fully operable from the large touchscreen, and includes 20 preset menu choices. 17. Include delivery charges. 18. Include all parts and labor to install units i.e. electrical hookups, any plumbing connections and/or refrigeration connections in quote. Work to be done by licensed contractor. 19. Awarded vendor to remove and dispose of old units and need to recover refrigerant as per EPA standards. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |