Similar Projects
Crescent Bluff Section 4
Infrastructure
Bidding
TX

Parkside on the River Phase 3, Section 2
Infrastructure
Bidding
TX

Bell Boulevard at Cypress Creek Road Intersection Improvements
Post-Bid
Cedar Park, TX 78613

Berry Creek Highlands - Phase I
Post-Bid
Georgetown, TX 78746

Southern Region Disaster Recovery Support BPA
Results

County Road 101 Construction
Results
$13,092,842 est. value
Georgetown, TX 78626

Parkside on the River Phase 3, Section 3A and 3B
Infrastructure
Bidding
TX

Parmer Ranch Phase 1
Post-Bid
TX

2019 Street Maintenance Program (SMP) - Arterials - University Blvd, Old Settlers Blvd, Sunrise Road, Red Bud Lane
Results
Less than $4,600,000 est. value
Round Rock, TX 78664

Great Oaks Dr, Parkside Pkwy Milling, Sealing and Overlay
Infrastructure
Bidding
$828,116 est. value
TX 78626

Caughfield Phase Ten Paving, Drainage, Water and Wastewater Improvements
Post-Bid
TX

2019 Street Maintenance Program (SMP) Project A - Type F Overlay
Results
$3,000,000 to $4,000,000 est. value
Round Rock, TX 78665

CR 313 from 1100 East of IH35 to 580 East CR 332 Milling, Sealing and Overlay
Infrastructure
Bidding
TX

Balcones Asphalt Paving
Post-Bid
$35,000 to $45,000 est. value

2019 Street Maintenance Program - Project A (SMP-A)
Results
$3,000,000 to $4,000,000 est. value
Round Rock, TX 78664

Last Updated 06/05/2021 02:16 AM
Project Title

FM 971 - Widen Road - Add Lanes

Physical Address View project details and contacts
City, State (County) TX   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,802,686
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing RowDollarsAnd CentsSta 20.100 1 104 6015 Removing Conc (Sidewalks)DollarsAnd CentsSy 199.000 2 104 6017 Removing Conc (Driveways)DollarsAnd CentsSy 205.000 3 104 6021 Removing Conc (Curb)DollarsAnd CentsLf 62.000 4 105 6074 Removing Stab Base And Asph Pav (4")DollarsAnd CentsSy 594.000 5 106 6002 Obliterating Abandoned RoadDollarsAnd CentsSy 4,520.000 6 110 6001 Excavation (Roadway)DollarsAnd CentsCy 150.000 7 132 6005 Embankment (Final)(Ord Comp)(Ty C)DollarsAnd CentsCy 49,185.000 8 160 6003 Furnishing And Placing Topsoil (4")DollarsAnd CentsSy 13,000.000 9 164 6007 Broadcast Seed (Perm) (Urban) (Clay)DollarsAnd CentsSy 13,000.000 10 164 6009 Broadcast Seed (Temp) (Warm)DollarsAnd CentsSy 6,500.000 11 164 6011 Broadcast Seed (Temp) (Cool)DollarsAnd CentsSy 6,500.000 12 168 6001 Vegetative WateringDollarsAnd CentsMg 390.000 13 247 6366 003 Fl Bs (Cmp In Plc)(Ty A Gr 5)(Fnal Pos)DollarsAnd CentsCy 5,044.000 14 310 6001 Prime Coat (Multi Option)DollarsAnd CentsGal 2,610.000 15 316 6004 002 Asph (Tier I)DollarsAnd CentsGal 6,604.000 16 316 6240 002 Aggr(Ty-Pd Gr-4 Sac-B)DollarsAnd CentsCy 116.000 17 340 6011 003 D-Gr Hma(Sq) Ty-B Pg64-22DollarsAnd CentsTon 3,491.000 18 340 6138 003 D-Gr Hma(Sq) Ty-D Pg76-22DollarsAnd CentsTon 1,912.000 19 340 6272 003 Tack CoatDollarsAnd CentsGal 2,513.000 20 354 6045 Plane Asph Conc Pav (2")DollarsAnd CentsSy 62.000 21 402 6001 Trench Excavation ProtectionDollarsAnd CentsLf 1,845.000 22 416 6030 Drill Shaft (Trf Sig Pole) (24 In)DollarsAnd CentsLf 48.000 23 416 6032 Drill Shaft (Trf Sig Pole) (36 In)DollarsAnd CentsLf 26.000 24 416 6034 Drill Shaft (Trf Sig Pole) (48 In)DollarsAnd CentsLf 44.000 25 423 6001 Retaining Wall (Mse)DollarsAnd CentsSf 3,964.000 26 423 6004 Retaining Wall (Conc Block)DollarsAnd CentsSf 2,125.000 27 423 6008 Retaining Wall (Cast - In - Place)DollarsAnd CentsSf 1,881.000 28 432 6002 Riprap (Conc)(5 In)DollarsAnd CentsCy 77.000 29 450 6051 Rail (Handrail)(Ty E)DollarsAnd CentsLf 1,252.000 30 462 6015 002 Conc Box Culv (7 Ft X 4 Ft)DollarsAnd CentsLf 222.000 31 462 6034 002 Conc Box Culv (10 Ft X 10 Ft)DollarsAnd CentsLf 103.000 32 464 6003 001 Rc Pipe (Cl Iii)(18 In)DollarsAnd CentsLf 1,047.000 33 464 6005 001 Rc Pipe (Cl Iii)(24 In)DollarsAnd CentsLf 535.000 34 464 6007 001 Rc Pipe (Cl Iii)(30 In)DollarsAnd CentsLf 41.000 35 465 6022 001 Inlet (Compl)(Pco)(5ft)(Left)DollarsAnd CentsEa 5.000 36 465 6023 001 Inlet (Compl)(Pco)(5ft)(Right)DollarsAnd CentsEa 5.000 37 466 6182 Wingwall (Pw - 1) (Hw=7 Ft)DollarsAnd CentsEa 2.000 38 467 6359 Set (Ty Ii) (18 In) (Rcp) (4: 1) (P)DollarsAnd CentsEa 1.000 39 467 6391 Set (Ty Ii) (24 In) (Rcp) (4: 1) (P)DollarsAnd CentsEa 2.000 40 496 6004 Remov Str (Set)DollarsAnd CentsEa 4.000 41 496 6005 Remov Str (Wingwall)DollarsAnd CentsEa 4.000 42 496 6006 Remov Str (Headwall)DollarsAnd CentsEa 2.000 43 496 6007 Remov Str (Pipe)DollarsAnd CentsLf 291.000 44 496 6008 Remov Str (Box Culvert)DollarsAnd CentsLf 114.000 45 500 6001 MobilizationDollarsAnd CentsLs 1.000 46 502 6001 008 Barricades, Signs And Traffic HandlingDollarsAnd CentsMo 8.000 47 506 6002 005 Rock Filter Dams (Install) (Ty 2)DollarsAnd CentsLf 70.000 48 506 6011 005 Rock Filter Dams (Remove)DollarsAnd CentsLf 70.000 49 506 6020 005 Construction Exits (Install) (Ty 1)DollarsAnd CentsSy 340.000 50 506 6024 005 Construction Exits (Remove)DollarsAnd CentsSy 340.000 51 506 6038 005 Temp Sedmt Cont Fence (Install)DollarsAnd CentsLf 2,830.000 52 506 6039 005 Temp Sedmt Cont Fence (Remove)DollarsAnd CentsLf 2,830.000 53 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1)DollarsAnd CentsLf 1,640.000 54 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2)DollarsAnd CentsLf 80.000 55 512 6033 Port Ctb (Move)(Low Prof)(Ty 1)DollarsAnd CentsLf 480.000 56 512 6034 Port Ctb (Move)(Low Prof)(Ty 2)DollarsAnd CentsLf 80.000 57 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1)DollarsAnd CentsLf 1,640.000 58 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2)DollarsAnd CentsLf 80.000 59 529 6007 Conc Curb & Gutter (Ty I)DollarsAnd CentsLf 53.000 60 529 6008 Conc Curb & Gutter (Ty Ii)DollarsAnd CentsLf 5,387.000 61 530 6004 Driveways (Conc)DollarsAnd CentsSy 454.000 62 531 6002 Conc Sidewalks (5")DollarsAnd CentsSy 2,181.000 63 531 6005 Curb Ramps (Ty 2)DollarsAnd CentsEa 6.000 64 531 6050 Concrete Sidewalk (Steps)DollarsAnd CentsSy 14.000 65 536 6002 Conc MedianDollarsAnd CentsSy 710.000 66 542 6001 Remove Metal Beam Guard FenceDollarsAnd CentsLf 645.000 67 610 6104 In Rd Il (U/P) (Ty 1) (150w Eq) LedDollarsAnd CentsEa 3.000 68 618 6023 Condt (Pvc) (Sch 40) (2")DollarsAnd CentsLf 178.000 69 618 6046 Condt (Pvc) (Sch 80) (2")DollarsAnd CentsLf 214.000 70 618 6047 Condt (Pvc) (Sch 80) (2") (Bore)DollarsAnd CentsLf 178.000 71 618 6053 Condt (Pvc) (Sch 80) (3")DollarsAnd CentsLf 175.000 72 618 6054 Condt (Pvc) (Sch 80) (3") (Bore)DollarsAnd CentsLf 1,152.000 73 618 6062 Condt (Rm) (3/4")DollarsAnd CentsLf 82.000 74 620 6007 Elec Condr (No.8) BareDollarsAnd CentsLf 1,700.000 75 620 6008 Elec Condr (No.8) InsulatedDollarsAnd CentsLf 1,730.000 76 620 6009 Elec Condr (No.6) BareDollarsAnd CentsLf 275.000 77 620 6010 Elec Condr (No.6) InsulatedDollarsAnd CentsLf 590.000 78 624 6002 Ground Box Ty A (122311)W/ApronDollarsAnd CentsEa 1.000 79 624 6009 Ground Box Ty D (162922)DollarsAnd CentsEa 5.000 80 628 6045 Elc Srv Ty A 240/480 060(Ns)Ss(E)Sp(O)DollarsAnd CentsEa 1.000 81 628 6165 Elc Srv Ty D 120/240 070(Ns)Al(E)Sp(O)DollarsAnd CentsEa 1.000 82 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P)DollarsAnd CentsEa 12.000 83 644 6009 In Sm Rd Sn Sup&Am Ty10bwg(1)Sb(P)DollarsAnd CentsEa 6.000 84 644 6012 In Sm Rd Sn Sup&Am Ty10bwg(1)Sb(T)DollarsAnd CentsEa 1.000 85 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(T)DollarsAnd CentsEa 1.000 86 662 6063 Wk Zn Pav Mrk Remov (W)4"(Sld)DollarsAnd CentsLf 2,000.000 87 662 6095 Wk Zn Pav Mrk Remov (Y)4"(Sld)DollarsAnd CentsLf 2,085.000 88 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty WDollarsAnd CentsEa 84.000 89 662 6110 Wk Zn Pav Mrk Sht Term (Tab)Ty YDollarsAnd CentsEa 42.000 90 666 6029 007 Refl Pav Mrk Ty I (W)8"(Dot)(090mil)DollarsAnd CentsLf 37.000 91 666 6035 007 Refl Pav Mrk Ty I (W)8"(Sld)(090mil)DollarsAnd CentsLf 1,316.000 92 666 6047 007 Refl Pav Mrk Ty I (W)24"(Sld)(090mil)DollarsAnd CentsLf 304.000 93 666 6053 007 Refl Pav Mrk Ty I (W)(Arrow)(090mil)DollarsAnd CentsEa 10.000 94 666 6077 007 Refl Pav Mrk Ty I (W)(Word)(090mil)DollarsAnd CentsEa 10.000 95 666 6140 007 Refl Pav Mrk Ty I (Y)12"(Sld)(090mil)DollarsAnd CentsLf 118.000 96 666 6155 007 Refl Pav Mrk Ty I(Y)(Med Nose)(090mil)DollarsAnd CentsEa 1.000 97 666 6167 007 Refl Pav Mrk Ty Ii (W) 4" (Brk)DollarsAnd CentsLf 846.000 98 666 6170 007 Refl Pav Mrk Ty Ii (W) 4" (Sld)DollarsAnd CentsLf 3,546.000 99 666 6176 007 Refl Pav Mrk Ty Ii (W) 8" (Dot)DollarsAnd CentsLf 37.000 100 666 6178 007 Refl Pav Mrk Ty Ii (W) 8" (Sld)DollarsAnd CentsLf 1,316.000 101 666 6182 007 Refl Pav Mrk Ty Ii (W) 24" (Sld)DollarsAnd CentsLf 304.000 102 666 6184 007 Refl Pav Mrk Ty Ii (W) (Arrow)DollarsAnd CentsEa 12.000 103 666 6192 007 Refl Pav Mrk Ty Ii (W) (Word)DollarsAnd CentsEa 12.000 104 666 6205 007 Refl Pav Mrk Ty Ii (Y) 4" (Brk)DollarsAnd CentsLf 178.000 105 666 6207 007 Refl Pav Mrk Ty Ii (Y) 4" (Sld)DollarsAnd CentsLf 1,835.000 106 666 6212 007 Refl Pav Mrk Ty Ii (Y) 12" (Sld)DollarsAnd CentsLf 118.000 107 666 6217 007 Refl Pav Mrk Ty Ii (Y) (Med Nose)DollarsAnd CentsEa 1.000 108 666 6299 007 Re Pm W/Ret Req Ty I (W)4"(Brk)(090mil)DollarsAnd CentsLf 846.000 109 666 6302 007 Re Pm W/Ret Req Ty I (W)4"(Sld)(090mil)DollarsAnd CentsLf 3,546.000 110 666 6311 007 Re Pm W/Ret Req Ty I (Y)4"(Brk)(090mil)DollarsAnd CentsLf 178.000 111 666 6314 007 Re Pm W/Ret Req Ty I (Y)4"(Sld)(090mil)DollarsAnd CentsLf 1,835.000 112 672 6007 Refl Pav Mrkr Ty I-CDollarsAnd CentsEa 50.000 113 672 6009 Refl Pav Mrkr Ty Ii-A-ADollarsAnd CentsEa 50.000 114 672 6010 Refl Pav Mrkr Ty Ii-C-RDollarsAnd CentsEa 300.000 115 677 6001 Elim Ext Pav Mrk & Mrks (4")DollarsAnd CentsLf 6,900.000 116 680 6002 006 Install Hwy Trf Sig (Isolated)DollarsAnd CentsEa 1.000 117 680 6004 006 Removing Traffic SignalsDollarsAnd CentsEa 1.000 118 682 6001 Veh Sig Sec (12")Led(Grn)DollarsAnd CentsEa 11.000 119 682 6002 Veh Sig Sec (12")Led(Grn Arw)DollarsAnd CentsEa 5.000 120 682 6003 Veh Sig Sec (12")Led(Yel)DollarsAnd CentsEa 11.000 121 682 6004 Veh Sig Sec (12")Led(Yel Arw)DollarsAnd CentsEa 9.000 122 682 6005 Veh Sig Sec (12")Led(Red)DollarsAnd CentsEa 11.000 123 682 6006 Veh Sig Sec (12")Led(Red Arw)DollarsAnd CentsEa 4.000 124 682 6018 Ped Sig Sec (Led)(Countdown)DollarsAnd CentsEa 8.000 125 682 6051 Backplate W/Refl Brdr(3 Sec)AlumDollarsAnd CentsEa 10.000 126 682 6052 Backplate W/Refl Brdr(4 Sec)AlumDollarsAnd CentsEa 4.000 127 682 6053 Backplate W/Refl Brdr(5 Sec)AlumDollarsAnd CentsEa 1.000 128 684 6028 Trf Sig Cbl (Ty A)(14 Awg)(2 Condr)DollarsAnd CentsLf 1,500.000 129 684 6031 Trf Sig Cbl (Ty A)(14 Awg)(5 Condr)DollarsAnd CentsLf 3,130.000 130 684 6033 Trf Sig Cbl (Ty A)(14 Awg)(7 Condr)DollarsAnd CentsLf 1,400.000 131 686 6051 Ins Trf Sig Pl Am(S)1 Arm(48')LumDollarsAnd CentsEa 2.000 132 686 6059 Ins Trf Sig Pl Am(S)1 Arm(55')LumDollarsAnd CentsEa 1.000 133 686 6063 Ins Trf Sig Pl Am(S)1 Arm(60')LumDollarsAnd CentsEa 1.000 134 687 6001 Ped Pole AssemblyDollarsAnd CentsEa 8.000 135 688 6001 Ped Detect Push Button (Aps)DollarsAnd CentsEa 8.000 136 688 6003 Ped Detector Controller UnitDollarsAnd CentsEa 1.000 137 1004 6001 Tree ProtectionDollarsAnd CentsEa 11.000 138 5122 6001 Water Quality Sand Filtration PondDollarsAnd CentsEa 1.000 139 6001 6002 Portable Changeable Message SignDollarsAnd CentsEa 3.000 140 6004 6031 Its Com Cbl (Ethernet)DollarsAnd CentsLf 79.000 141 6185 6005 002 Tma (Mobile Operation)DollarsAnd CentsDay 20.000 142 6292 6001 Rvds(Presence Detection Only)DollarsAnd CentsEa 4.000 143 6292 6002 Rvds(Advance Detection Only)DollarsAnd CentsEa 4.000 144

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents