Similar Projects
Mill Creek Metroparks Gasoline and Fuel Oil
Post-Bid
Canfield, OH

Chemical Inventory
Post-Bid
Bowling Green, OH 43402

East Harbor State Park Marina Fuel System Improvement
Results
Less than $309,750 est. value
Lakeside, Marblehead, OH 43440

Hueston Woods Marina
Results
Less than $100,000 est. value
College Corner, OH 45003

Hamilton Enterprise Park (HEP) Gas Main Loop
Results
Hamilton, OH

FCI ELKTON - Phase 2 - Remove UST
Results
$250,000 to $500,000 est. value
Lisbon, OH

Polyethylene and Fiberglass Stationary Liquid Storage Tanks
Term Contract
Results

SSO 700 STF Disinfection Improvements
Results
Less than $4,000,000 est. value
Cincinnati, OH

Gas Regulator SCADA Conduit Project
Results
Hamilton, OH 45011

Compressed Natural Gas (CNG) Fueling System Services
Results
Less than $546,400 est. value
Columbus, OH 43215

Above Ground Fuel Storage Tank/ Equipment
Results
Riverside, OH 45204

Renovation of the Fields Avenue Facility (Underground Storage Tank Removal)
Results
Less than $203,254 est. value
Columbus, OH 43215

Fuel System Maintenance
Term Contract
Results
Cincinnati, OH 45202

Secondary Improvements, 1-44C Phase I
Results
Toledo, OH

Underground/Aboveground Storage Tanks
Results
Less than $144,640 est. value
Westerville, OH 43081

Last Updated 05/05/2021 03:17 PM
Project Title

2021-2023 North East Gas Main Replacement

Physical Address View project details and contacts
City, State (County) Lancaster, OH   (Fairfield County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the replacement/upgrade of a bare steel low pressure gas system with a plastic medium pressure system including gas mains, service lines, and residential meter setting relocations to the outside of each house. The Project will extend from year 2021 to through year 2023 with the amount of Work to be performed each specified by the City. Approximately, 25,352-feet of 2-inch HDPE gas main and 1,688-feet of 4-inch HDPE gas main will be installed by directional drilling methods. A pre-construction and a post-construction CCTV video is required in areas where directional drill bore path will cross or parallel sewer mains or laterals, about 39,308-feet of each. Also, a pre-construction site video is required. Contractor shall provide a copy of preconstruction and post-construction CCTV videos and job site video to the City. 632 residential service lines will be replaced with 1-in CTS MDPE pipe. Any meter settings that are currently inside will be relocated to the outside. A pressure test using a water monometer or device of equal sensitivity is required to be performed on all existing house piping by contractor prior to connecting said piping to the newly installed meter set. This pressure test will be performed under the supervision of qualified City personnel, and in accordance with City policies and procedures, as well as federal, state and local regulations.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents