Similar Projects
Kaneland Multi-Site Intercom Replacement
Post-Bid
Elburn, Sugar Grove, IL 60119

Sound System at Dundee Crown High School
Post-Bid
Carpentersville, IL 60110

Replace Exterior Doors and Upgrade Security
Results
Less than $250,000 est. value
Elgin, IL 60123

Telecommunications Infrastructure Testing Services - Worldwide
Results

Central Station Alarm Monitoring (CSAM)
Post-Bid

Culinary Center AV Upgrade
Results
Elgin, IL

New Elementary School – Bid Release 3
New Construction - 86,260 SF
Post-Bid
Hampshire, IL

Corrections, Sheriff`s Office and Judicial Camera Upgrade
Results
Geneva, IL

Network Cabling
Term Contract
Post-Bid
Batavia, IL

Building A COVID Security Access Control Upgrade
Alteration
Results
Geneva, IL 60134

Alarm Service and Repair
Term Contract
Post-Bid
Algonquin, IL

Telecommunications System and Data Network Equipment and Installation
Alteration
Results
Batavia, IL 60510

Data Cabling
Term Contract
Post-Bid
Algonquin, IL

Low Voltage Cabling
Alteration
Results
IL

Inmate Telephone System at City of Aurora Police Department Jail
Alteration
Post-Bid
Aurora, IL 60505

Last Updated 05/12/2022 09:36 AM
Project Title

FY22 Elgin MHC Spider Alarm System Replacement

Physical Address View project details and contacts
City, State (County) Elgin, IL 60123   (Kane County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To remove and replace the existing spider alarm system. The work will provide labor, material and equipment to remove old spider alarm system and install a new Guard1 system or equivalent. Provide 63 Guard1 or equivalent receivers and install receivers every 75 feet down hallways at the Forensic Treatment Building and the Brunk and Hinton Unit hallways in the Goldman Building. Run cables between the server rooms and each of the receivers and connections made to available switch ports.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents