Similar Projects
Last Updated | 07/11/2022 03:28 PM |
Project Title | Terminal Piping Construction |
Physical Address | View project details and contacts |
City, State (County) | Beaumont, TX (Jefferson County) |
Category(s) | Transportation |
Sub-Category(s) | Airline/Passenger Terminal |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes: 1. New Sleeper Rack and T-pole Piling. 2. Existing Sleeper Rack Extension Piling. 3. New Manifold Foundation Piling. 4. New Manifold Foundation. 5. Eastern Rail Truss to 2200 Tank/Pipe Rack Area. 6. Existing 2300 Manifold Piping. 7. Piping Modifications – ExxonMobil Area. 8. Installation of CMA Procured Piping & Equipment. 9. Hydrostatic Testing – Line Cleaning/Pigging Standard. 10. Non-Destructive Testing. 11. Misc. Pipe Support Pedestal. 12. Structural Modifications to Existing Pipe Rack Areas. 13. Existing Sleeper Extensions/Modification. 14. Misc. Pipe Support Additions. 15. New Miscellaneous Platforms. 16. Piping Demolition. 17. Dock Area Pipe Rack Piping. 18. RPP Rail Truss through Existing 2000 Manifold Piping. |
||||||||||||||||||||||||||||||||||||||||||||
Details | Airline/Passenger Terminal, Build-Out.
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |