Similar Projects
Roof and HVAC Renovations To The Carroll County Magistrate Court Building
Bidding
Carrollton, GA 30116

Furnish and Install Boiler at JCCI
Bidding
Jefferson, GA 30549

Replace Boiler and Cooling Tower at Douglass High School
Sub-Bidding
Atlanta, GA 30318

Cooling Treatment Maintenance Services
Post-Bid
Jonesboro, Riverdale, GA 30236

BCCCA HVAC and Lighting Replacement
Post-Bid
Cartersville, GA 30121

HVAC Services 2019
Term Contract
Results
Warner Robins, GA

Construction Management at Risk Services Watson Cooling Tower Replacement
Results
Less than $275,000 est. value
Statesboro, GA

Warren County HVAC
Construction
Warrenton, GA 30828

HVAC Maintenance for The Jail
Bidding
$100,000 to $112,000 est. value
Athens, GA 30605

Aubrey Street Recreational Gymnasium HVAC System
Post-Bid
Cartersville, GA 30120

HVAC Filter Change-Out
Term Contract
Results
Adairsville, GA

Magistrate Court HVAC Renovation
Bidding
Statesboro, GA 30458

HVAC Ingram Pye Elementary School
Post-Bid
Macon, GA 31204

New HVAC System for PE Facility
Results
Sandersville, GA

Demolition Services
Bidding
Perry, GA 31069

Reported 04/03/2020 12:00 AM
Project Title

Hunter Gym/Clay-Wood Gym HVAC Installations

Physical Address View project details and contacts
City, State (County) Newnan, GA 30263   (Coweta County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide and install new HVAC systems per plans and specifications. • Provide and install commercial, wall mounted programmable thermostat with auto changeover, fan ON/AUTO control and louvered steel T’STAT guard. • Start-up new HVAC systems and monitor for any issues. • Install new system to the current industry standard and building codes. • Contractor to supply new system with a minimum one-year labor warranty and minimum five-year parts warranty from date of completion. • The contractor will comply with industry standards and best practices as it pertains to safety for the duration of the project. • The contractor will be responsible to ensure the safety of the citizens and building occupants with the use of barricades and signage. • Contractor is responsible for the protection of the building from weather related conditions during the process of installation. • Contractor is responsible the protection of the gymnasium floor during theinstallation of HVAC systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents