Similar Projects
Rehabilitate Runway 12-30 Lighting at Long Beach Airport
Term Contract
Bidding
Long Beach, CA 90808

La Mesa Junior High School 2 Shade Structures and Outdoor Lighting Project
Term Contract
Bidding
Santa Clarita, CA 91351

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

PRM Mass Care Shelter Electrical Project
Term Contract
Bidding
Long Beach, CA

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Led Lighting Retrofit
Alteration
Post-Bid
Los Angeles, CA 90007

Electrical System Repair Services
Alteration
Results
CA

Electric Vehicle Charging Station Solutions
Infrastructure
Post-Bid
Carson, CA 90745

Electrical System Repair Services
Alteration
Results
CA

Reported 03/01/2022 12:00 AM
Project Title

Campus Electrical Infrastructure Upgrade

Physical Address View project details and contacts
City, State (County) Carson, CA 90747   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To install a new SCE service with one 16.5kV feeder to replace the two existing feeders. To replace the existing SCE 16.5kV P/E service switchgear and two aged transformers with a new SCE 16.5kV customer main breaker switchgear and SCE meter section. The design to replace the aging campus 12kV electrical distribution infrastructure on campus has also been initiated. The campus 12kV distribution replacement project includes replacing all of the 12kV SF6 switches installed on campus with new solid dielectric switches. Equipment installed below grade in vaults will be demolished and replaced with above grade pad mounted equipment. Electrical equipment will also be demolished to allow for road widening and reconfiguration for improved traffic flow and pedestrian access. The project will also include the installation of new duct banks and cable to reconfigure the 12kV system to better serve existing loads and to allow for the connection of future campus building projects.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents