Similar Projects
Superior Dairy
Addition
Conception
$25,000,000 est. value
Canton, OH 44706

Creative Millwork`s Addition
New Construction
Conception
Ashtabula, OH 44004

Solar Farm
New Construction
Design
$125,000,000 est. value
Bellevue, OH 44811

Solar Farm
New Construction
Design
$125,000,000 est. value
Bellevue, OH 44811

Emerson Climate Technologies
Renovation, Addition - 91,831 SF
Construction
$100,000,000 est. value
Sidney, OH 45365

Pig Iron Plant
New Construction
Construction
$474,000,000 est. value
Ashtabula, OH 44004

General Mills Expansion
Addition
Pending Verification
Wellston, OH 45692

Plug Power Expansion
Addition
Pending Verification
West Carrollton, OH 45449

Prince & Izant
Addition - 30,000 SF
Conception
Cleveland, OH 44130

National Foods Packaging
Addition
Design
Cleveland, OH 44102

Dupont Circleville Works
New Construction - 65,000 SF
Construction
$220,000,000 est. value
Circleville, OH 43113

Cabinet Assembly and Distribution Center (Former Sears)
Renovation - 140,000 SF
Pending Verification
$2,000,000 est. value
Akron, OH 44310

Cintas Corporation
Build-Out - 255,000 SF
Conception
Middletown, OH 45044

Unison - Dayton
New Construction - 320,000 SF
Design
$10,000,000 CJ est. value
Beavercreek, OH 45430

General Motors Engine Plant
New Construction - 251,000 SF
Construction
$175,000,000 est. value
Brookville, OH 45309

Last Updated 01/04/2022 10:02 AM
Project Title

First Solar New Plant

Physical Address View project details and contacts
City, State (County) Millbury, OH   (Wood County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Design-Build Firm to Subcontract.
Project Status Seeking Zoning Variances, Construction Completion Expected first quarter 2023
Bids Due View project details and contacts
Estimated Value $680,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, 1,900,000 SF New Construction, 10 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents