Similar Projects
Asphalt Pavement Repairs
Infrastructure
Bidding
Port Orchard, WA

2022 Citywide Asphalt Repair Project Contract
Infrastructure
Bidding
$46,000 to $815,000 est. value
Port Orchard, WA

Fieldstone Rolling Bay Phase II Cd
Renovation - 119,771 SF
Post-Bid
Bainbridge Island, WA 98110

2022 Preservation Project - Glenwood Rd & Holly Road
Infrastructure
Post-Bid
$900,000 to $1,250,000 est. value
WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

Sportsman Club and New Brooklyn Road Intersection Improvements
Infrastructure
Post-Bid
$920,000 est. value
Bainbridge Island, WA 98110

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Systemic Safety Improvements
Infrastructure
Bidding
$180,000 to $210,000 est. value
Poulsbo, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Post-Bid
$300,000 to $10,000,000 est. value

Preservation Glenwood Road and Holly Road
Infrastructure
Results
$900,000 to $1,250,000 est. value
WA

2022 Annual Roads Program
Infrastructure
Bidding
$575,000 to $650,000 est. value
Bainbridge Island, WA

Central Valley Road Non Motorized Improvements
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
WA

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

Reported 04/12/2022 03:51 PM
Project Title

Bremerton Station

Physical Address View project details and contacts
City, State (County) Bremerton, WA 98310   (Kitsap County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shopping Center/Strip Mall, Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The company's plans for 2022 include a Chipotle and MOD Pizza at the corner of an intersection it notes carries more than 80,000 cars each day, not far from a number from where a combined 700 apartment units are under construction. It hopes to open a Wendy's Restaurant south of the other two in 2023.

Details

Shopping Center/Strip Mall, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents