Similar Projects
Last Updated | 08/30/2021 01:35 PM |
Project Title | Jesse Cooper - West Side Stairs and Ramp Renovations |
Physical Address | View project details and contacts |
City, State (County) | Dover, DE 19901 (Kent County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Masonry, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project involves replacing the existing brick entry walk and ramps with a new dry-laid brick paver system. Replacing the existing damaged marble stair treads with new pre-cast concrete stair treads. The existing guard/handrail on the ramps and stair is failing at the base, so it will be removed, new stainless-steel sleeves will be installed at the base, then the existing hand/guardrail will be reinstalled it in its original location. All the existing brick walls on the ramps and garden walls will be repointed. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |