Similar Projects
Marine Science Center ADA Enhancements
Bidding
Less than $65,000 est. value
Ponce Inlet, FL 32127

Fleming Avenue ADA Sidewalk
Bidding
Less than $70,500 est. value
De Land, FL 32720

New Smyrna Beach High School Campus Wide Elevated Walkway Repairs
Post-Bid
New Smyrna Beach, FL 32168

Thornby Park Boardwalk and Trail Improvements
Post-Bid
Less than $286,000 est. value
Deltona, FL

Concrete Driveway and Site Work for Lift Station #31 Project
Results
De Land, FL 32720

Sweetheart Trail - Beach St. Wilder Blvd. to Shady Place
Results
Daytona Beach, FL 32100

New Hampshire Avenue ADA Sidewalk
Post-Bid
Less than $127,000 est. value
De Land, FL 32720

Providence Boulevard Shared Use Trail
Results
Deltona, FL

Sunrise Park Boat Ramp Improvements
Results
Less than $1,094,325 est. value
Holly Hill, FL

Design/Build Services for The East Central Regional Rail Trail, Phase 4A (Guise Road to Gobbler's Lodge Road, Osteen)
Results
Osteen, FL

30th Street ADA Sidewalk Project - Pine Tree Drive to Hibiscus Drive
Results
Less than $74,545 est. value
Edgewater, FL

Sweetheart Trail - Sickler Drive
Results
Daytona Beach, FL

Rob Sullivan CDBG / ADA Parking Stalls
Results
DeBary, FL 32713

CDBG Ames Parking Improvements and Landscape Renovations
Results
Ormond Beach, FL 32173

Sidewalk Repair and Reconstruction Project
Results
DeBary, FL

Last Updated 03/11/2019 05:50 AM
Project Title

Dr. Martin Luther King, Jr. Blvd. Roadway and Pedestrian Improvements Project

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32100   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $2,200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work generally consists of the complete reconstruction of MLK Blvd, (between Orange Ave and International Speedway Blvd), widening the sidewalks to 8-feet on both sides, curb and gutter, new water main and water services, gravity sewer system and sewer laterals, relocating power poles to backside of sidewalk will be done by others, landscaping and irrigation, and street lights.
Details
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents