Similar Projects
Reported | 08/06/2020 12:00 AM |
Project Title | Roadside Mowing / Bush Hogging |
Physical Address | View project details and contacts |
City, State (County) | Turner, ME 04282 (Androscoggin County) |
Category(s) | Single Trades |
Sub-Category(s) | Landscaping/Irrigation |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work will be done on an estimated 119.9lane miles. Minimum equipment shall be a 6-foot bush hog rotary ditch bank mower, preferably with an extension. Mower will have the capacity to cut small bushes and trees. Each mile of roadside shall be cut a minimum of 6 feet from edge of pavement, (where practical) or a maximum of 8 feet, paying particular attention to intersections. Caution, responsible judgment, and care, shall be used in front of and along residential properties. No cuttings or debris is to be left with in the travel part of the right of way. Work shall be started no earlier than August 4, 2020, and be completed by August 31, 2020. Contractor will be responsible for all labor, equipment and maintenance thereof necessary to complete the project. The equipment to be used for this project will be inspected before the award of the bid and may be inspected at any time during the project. The successful bidder shall provide proof of general liability, equipment, and worker’s compensation insurance before any work begins, with the Town of Turner listed as “Other Named Insured”. Before the Town renders any payment, a completed W-9 form will need to be submitted. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |