Similar Projects
UO Retainer Program - Consulting Services - Extended Period
Renovation, Term Contract
Bidding

Engineering - Development of Talent, Ashland and Phoenix (TAP) Water System Improvements
Infrastructure
Bidding
$5,000 to $75,000 est. value
Ashland, OR

Engineering, Planning and Development
Post-Bid

Wastewater Treatment Plant in Vessel Composting Feasibility
Infrastructure
Post-Bid
Ashland, OR

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

2021-03 N Mountain Ave Overlay - I-5 to E Main Design and Construction Services
Infrastructure
Results
Ashland, OR 97520

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Bear Creek Greenway Revisioning Plan
New Construction, Infrastructure
Results
Central Point, OR

ODA Aviation Engineering Services Consulting Services (Engineering/Inspection and Ca) Airport Specific
Infrastructure
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Ashland Community Center and Pioneer Hall Improvements
New Construction, Infrastructure
Results
Ashland, OR 97520

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Last Updated 05/31/2022 01:51 AM
Project Title

Flow Augmentation Water Quality Trading Plan for Excess Thermal Load

Physical Address View project details and contacts
City, State (County) Ashland, OR   (Jackson County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For professional engineering consulting services for Project 2021-12 Flow Augmentation Water Quality Trading Plan for Excess Thermal Load. This project will facilitate regulatory compliance with Excess Thermal Load (ETL) water quality provisions in the City’s new National Pollution Discharge Elimination System (NPDES) Permit, which regulates discharges from the Wastewater Treatment Plant (WWTP) to receiving waters in Bear Creek and Ashland Creek. The consulting team will provide all applicable studies, analysis, modeling, and reporting leading to, and including, the development of a water quality trading plan pursuant to applicable Oregon Water Quality Trading rules in OAR 340-039. The Plan will provide a strategy for ETL reduction at the WWTP outfall in Bear Creek via controlled releases of stored cold water from Reeder Reservoir. This project will include the following phases: Feasibility/Limitations Study. Thermal Benefit Analysis. Water Quality Trading Plan Development

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents