Similar Projects
Last Updated | 11/29/2021 02:59 PM |
Project Title | Oak View Middle School New Classrooms Addition |
Physical Address | View project details and contacts |
City, State (County) | Newberry, FL 32669 (Alachua County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $7,250,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the design and construction of 15 new classrooms, including completing Building 7, and a new Building 10. Site design will include stormwater retention (if applicable). The work includes, but is not limited to: New Classroom Addition with Alternates, Allowances, General Commissioning Requirements, Demolition, Selective Structure Demolition, Cast-In-Place Concrete, Masonry Grout, Reinforced Unit Masonry, Structural Steel, Steel Floor Deck, Steel Roof Deck, Cold-Formed Steel Roof Trusses, Metal Fabrications, Metal Pan Stairs, Miscellaneous Rough Carpentry, Finish Carpentry, Architectural Wood Casework, Damp proofing, Water Repellents, Blanket Insulation, Foamed-In-Place Insulation, Vapor Retarders, Fluid Applied Membrane Air Barriers, Metal Siding, Sheet Metal Roofing, Sheet Metal Flashing and Trim, Roof Specialties, Joint Protection, Door Schedule, Hollow Metal Doors and Frames, Flush Wood Doors, Access Doors and Frames, Aluminum-Framed Entrances and Storefronts, Aluminum Windows, Door Hardware, Glazing, Finish Schedule, Gypsum Board Assemblies, Nonstructural Metal Framing, Cement Plastering, Acoustical Panel Ceilings, Resilient Flooring, Resinous Flooring, Painting and Coating, Specialties, Signage, Toilet Compartments, Wet wall Waterproof Wall Panel System, Toilet, Bath and Laundry Accessories, Protective Covers, Manual Roller Shades, Division 21 Fire Suppression, Division 22 Plumbing, Division 23 Heating, Ventilating and Air Conditioning (HVAC), Division 25 Integrated Automation, Division 26 Electrical, District 27 Communications, Division 28 Electronic Safety and Security, Division 31 Earthwork, Division 32 Exterior Improvements and Division 33 Utilities. |
||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, 21,773 SF Addition.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |