Similar Projects
Last Updated | 07/27/2021 08:09 AM |
Project Title | CEI and GEO Services for the Port St. Lucie Boulevard North Project |
Physical Address | View project details and contacts |
City, State (County) | Port Saint Lucie, FL (Saint Lucie County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. A state of Florida Professional Engineering license is required to submit a proposal for this project. Project Description The Engineer shall provide Construction Engineering and Inspection (CEI) & Geotechnical (GEO) Services for the Port St. Lucie Boulevard North Project. The project includes all work associated with the reconstruction of Port St. Lucie Blvd from Gatlin Boulevard to Darwin Boulevard including approximately 800’ of Darwin Boulevard East of Port St. Lucie Boulevard. Improvements include, but are not limited to, milling/resurfacing, utility relocation, sidewalks, underground drainage, signals, lighting, and landscaping as shown in the plans. The Engineer shall perform the following scope of construction related services: 1. Provide constructability review of plans and offer comments and Cost Saving Initiative’s (CSI’s), as available. 2. Review and become familiar with final (IFC) contract documents (construction plans, specifications, bid documents, permits, etc.) 3. Conduct pre-construction meeting. Prepare response to questions if necessary. 4. Review the following Contractor supplied documents for consistency with the bid documents, plans and specifications prior to site mobilization: A) Construction Project Schedule B) Shop Drawings C) Product Specifications D) Dewatering Plan E) Survey Control Documentation F) NPDES Construction Notification G) Maintenance of Traffic Plan 5. Coordination of daily site inspection by Engineer’s Inspector, with the following tasks performed: A. Review contractor’s planned activities for the day B. Coordinate testing of materials C. Summarize personnel and equipment present D. Observe construction materials staged onsite E. Observe and monitor offsite drainage and property impacts F. Observe and monitor erosion control measures G. Observe and monitor maintenance of traffic H. Perform periodic checks of contractor’s compliance with contract specification requirements I. Photo document site as needed J. Document and summarize resolution of any problems, issues, contract interpretations, etc. K. Complete Daily Work Reports L. Document pay item quantities for constructed/installed materials 6. Provide weekly project progress photos of key construction activities. 7. Coordinate with City staff and/or Public Information Officer (PIO) to provide resident’s information and respond to resident complaints. 8. Review and respond to any written Contractor Requests for Information (RFIs) 9. Direct field changes 10. Review and provide recommendations to the City on any change orders necessary to complete intent of project scope. 11. Review and provide recommendations to the City on the Contractor’s Monthly Pay Request. 12. Conduct progress meetings and prepare minutes with City and Contractor personnel to discuss construction progress and issues. These meetings will be conducted bi-weekly. 13. Conduct initial and final walk-through inspections of project with pertinent stakeholders and provide City with punch list input. Ensure correction of any deficient items noted on punch list. 14. Review as-built construction plans submitted by the Contractor as well as final geotechnical testing results. The as-built drawings will provide the basis for the certification of construction completion. 15. Assist the City with any public involvement efforts necessary for the project. This includes but is not limited to notification and coordination with residents regarding construction timelines and impacts to their access. 16. Review and provide the City with recommendations and resolution on any claim issue provided to Engineer by the Contractor. 17. Provide and coordinate Geotechnical Services and Testing. DELIVERABLES The Consultant shall be required to prepare and submit the following: 1. A Construction Completion Package for the City’s records. The package will include the following: A. Daily work reports. B. Field survey/geotechnical verification data provided to Engineer by the Contractor and/or City. C. Final as-built plans provided to Engineer by the Contractor. D. Documentation of progress meetings, and any other pertinent project meetings with dates and notes. E. Documentation of all field decisions which caused any deviation from the plans and/or specifications. F. Documentation of all testing results. G. Documentation of progress payments and final payment to the Contractor. H. RFIs and responses. Change order requests provided by the contractor. Copies of all executed changes to the contract. I. Final inspection punch lists developed, with dates of item resolution. J. All other project records developed. 2. Prepare CD/DVD containing electronic copy of all deliverables in PDF format. 3. Provide the City with signed and sealed test results. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |