Similar Projects
Wastewater Treatment Facility Expansion
Addition
Design
$12,000,000 to $12,300,000 est. value
Owatonna, MN 55060

WRRF Digester and Disinfection Improvements
Renovation
Bidding
Mankato, MN 56001

Lift Station Maintenance and Repair Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

DNR2 RFB Brainerd Office Replacement Lift Pumps
Renovation
Post-Bid
Brainerd, MN 56401

MCES Rogers Modifications
Renovation
Results
Rogers, MN 55374

Wood Lake Lift Station Improvements
Results
$625,000 est. value
Richfield, MN

2021 Sanitary Lift Station No. 33 and No. 34 Improvements
Renovation
Post-Bid
$532,065 est. value
Moorhead, MN

Ridgedale Booster Station Improvements
Results
$450,000 est. value
Minnetonka, MN 55345

Empire WWTP Solids Improvements Phase II
New Construction
Post-Bid
Farmington, MN 55024

Williston Road Lift Station Rehabilitation
Results
$1,950,000 est. value
Minnetonka, MN

Lift Station - 11 Improvements
Renovation
Post-Bid
$750,000 to $800,000 est. value
Andover, MN

Wastewater Treatment Facility
Results
Chisago City, MN 55013

WLSSD Wastewater Treatment Facility
New Construction
Post-Bid
Duluth, MN

Wastewater Treatment Facility Improvements
Results
$1,800,000 to $2,000,000 est. value
Madelia, MN

Wastewater Treatment Facility
Addition
Post-Bid
Caledonia, MN

Last Updated 01/04/2022 03:14 PM
Project Title

Regional Wastewater Treatment Facility - Contract 1

Physical Address View project details and contacts
City, State (County) Oronoco, MN   (Olmsted County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method
Project Status Construction Commenced December 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is generally described as follows: construction of a new Wastewater Treatment Facility, pump stations, access roadway, water well and distribution piping, sanitary sewer collection piping, storm water drainage improvements, site work, grading, landscaping, and all related appurtenances work. Base Bid: A. Wastewater Treatment Facility- Work consists of construction of new Administration and Shop Building, Pretreatment Building, SBR Tanks, Tertiary Building, Aerated Digester/Solids Handling Tanks, Plant Drain Lift Station, and Effluent Lift Station. B. Provide new equipment for screening, grit, filter, UV, sludge handling, and lift station systems to create a fully functioning WWTF. C. Construction of site work including excavation, roadways, utilities, stormwater management, yard piping and as described in the bidding documents. D. WWTF Site Work is described in general, non-inclusive terms as furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the internal: 1. Sanitary Sewer Force Main. 2. Watermains. 3. Stormwater Drainage. 4. Water Services. 5. Site Grading, Landscaping and Lighting. 6. Private Utilities Distribution

Details

Sewage Treatment Plant, New Construction, Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents