Similar Projects
Bridgeland Central - Master Development
New Construction - 506,000 SF
Conception
Cypress, TX 77433

Cypress Waters Office Buildings
New Construction - 300,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX

GreenSpace Self Storage
New Construction - 140,400 SF
Design
$5,000,000 est. value
Pearland, TX 77584

Freer TX Border Patrol Station (BPS) Complex
LEED Certification, New Construction, Infrastructure - 47,000 SF
Bidding
$100,000,000 CJ est. value
Freer, TX 78357

Freer TX Border Patrol Station (BPS) Complex
LEED Certification, New Construction, Infrastructure - 47,000 SF
Bidding
$100,000,000 CJ est. value
Freer, TX 78357

Right Move Self Storage
New Construction - 76,674 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77025

Right Move Self Storage
New Construction - 76,674 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77025

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

Trinity Mills Station Phase I
New Construction - 125,000 SF
Results
$10,000,000 CJ est. value
Carrollton, TX 75006

Stacy Green
New Construction
Construction
Allen, TX 75013

Kyle Business Park
New Construction - 10,500 SF
Construction
$890,000 est. value
Kyle, TX 78640

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Heritage Creekside Office Buildings
New Construction
Design
Plano, TX 75074

Public Storage - Westheimer
New Construction, Renovation - 124,875 SF
Post-Bid
Houston, TX 77027

Weir's Plaza Office Building
New Construction
Construction
Dallas, TX 75205

Last Updated 08/23/2022 03:04 PM
Project Title

CAP Fleet Upfitters Assembly Building

Physical Address View project details and contacts
City, State (County) Caldwell, TX 77836   (Burleson County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of metal building for warehouse, police care unfitting, and offices As of August 23, 2022, no permits have been submitted for this project. Information regarding the method of general contractor selection has not been disclosed. A construction schedule is unavailable. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Office, New Construction, Warehouse/Storage, 120,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents