Similar Projects
Morgue and Building 35A Roof Replacements
Renovation - 13,429 SF
Post-Bid
$1,000,000 CJ est. value
West Haven, CT 06516

1 Union Ave PD Roof Replacement
Renovation
Post-Bid
$200,000 CJ est. value
New Haven, CT 06519

Roof Replacement, Hop Brook Lake Project
Term Contract
Results
$500,000 est. value
Middlebury, CT 06762

Roof Replacement - Stanley T. Williams Community Center
Renovation
Results
$1,438,000 CJ est. value
Northford, CT 06472

Agency Wide Roofing Repairs/Replacement
Term Contract
Post-Bid
$200,000 CJ est. value
New Haven, CT 06510

1 Union Ave PD Roof Replacement
Renovation
Results
$964,000 CJ est. value
New Haven, CT 06519

Head Start Wolcott Roof Replacement
Renovation
Post-Bid
$200,000 CJ est. value
Wolcott, CT 06716

Meriden Police Department Roof
Renovation
Results
$111,444 CJ est. value
Meriden, CT 06451

Center Fire House New Roof
Renovation
Post-Bid
$300,000 CJ est. value
Oxford, CT 06478

Town Hall Roof Replacement
Renovation
Results
$150,280 CJ est. value
Cheshire, CT 06410

Small Cities Project -16 Northrop Road
Renovation
Post-Bid
$35,000 CJ est. value
Woodbridge, CT 06525

Central Station Roof Replacement
Renovation
Results
$26,896 CJ est. value
Bethany, CT 06524

Partial Roof Replacement at Foran High School
Renovation
Post-Bid
$200,000 CJ est. value
Milford, CT 06460

Agency Wide Roofing Repairs/Replacement
Renovation
Results
$116,596 CJ est. value
New Haven, CT 06510

Center Fire House Roof Replacement
Renovation
Post-Bid
$300,000 CJ est. value
Oxford, CT 06478

Last Updated 10/05/2023 05:34 AM
Project Title

424 Chapel Roof Replacement

Physical Address View project details and contacts
City, State (County) New Haven, CT 06511   (New Haven County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,226,614 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Q&A Tuesday, September 26, 2023 Any written Inquiry for Clarification must be received seven (7) or more business days prior to the Bid Opening Date and Time. Any request received by the City after this deadline will not be given consideration. Every request for such an interpretation shall be made in writing via email through your account Comprehensive new membrane roof installation including demolition of existing roof materials and unused roof equipment, and new code-compliant levels of insulation on roof walls and deck, and parapet and side wall waterproofing and flashing. Intend to Bid Due Date October 3, 2023 A. Roof Hatch: The roof hatch is furnished and installed by others. The guardrail and ladder are furnished and installed by this project. The roof hatch is Bilco Model #MS-50 with a custom 29" high curb. The ladder will be installed to the top landing of Stair C, and the height will need to be verified in the field. B. Dumpster Placement: Assume for the bid that the dumpster can be placed within 10 feet of the building. The location of the dumpster will be coordinated onsite. C. Concurrent Work: The contractor is expected to coordinate with other trades working onsite. There are many other trades onsite working on the first-floor gut renovations of the Health Department Office and Clinic and the Department of Public Works Office and Maintenance Garage. The Health Department is anticipated to receive substantial completion November 1, 2023 and will be occupied December 1, 2023. The Department of Public Works Maintenance Garage is anticipated to be operational in January, 2024 and the offices to be occupied in March, 2024. There is also ongoing site work in the parking lot and on South Wallace and electrical service work on South Wallace. Protect existing and new construction from damage and maintain a clean job site. D. Roof Equipment: The roof equipment is shown on the roof plan indicated as new or to be removed as part of the roof replacement project. The structure, curbing, and installation of new equipment is by others, and is expected to be completed before or during the roof installation. The curbs are all 24" high to accommodate the new insulation depth. E. Construction Schedule: The construction schedule is as soon as reasonably possible. F. Existing Roof Assembly: The existing roof assembly above the metal deck consists of 2" of insulation board, asphalt built-up roofing, 1/2" fiber cover board, single-ply EPDM roof membrane. G. Multiple Penetration Detail 30/R8: As noted a multiple penetration box will be required for each new rooftop unit. H. Wall Panels: There are no wall panels on the East Side of Roof 3 facing S. Wallace. Detail 26/R7 show the end closure for terminating the siding at the corner of the pop-up

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents